My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09/09/2020 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2020
>
09/09/2020 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2021 3:17:03 PM
Creation date
9/3/2020 2:28:30 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
09/09/2020
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Memo <br />Environmental <br />To: Katie Larsen <br />From: Andy Nelson <br />Date: August 261, 2020 <br />Re: Environmental Board and Environmental Coordinator comments for <br />Burque Property PUD Concept Plan <br />The following recommendations were made by the Lino Lakes Environmental <br />Board and Environmental Coordinator on Wednesday, August 26th, 2020 <br />regarding the Burque Property: <br />1. Greenway corridor should be established through the site. <br />2. Consider restoring wetland hydrology and vegetation on the site. <br />3. Clarify proposed wetland buffer widths and total buffer area. <br />4. Wetland buffers should have a minimum width of 25 feet and be 50 feet wide on <br />average. Flexibility on wetland buffer widths could be allowable provided <br />restoration of wetlands to higher quality was performed. <br />5. If any wetland impacts are proposed with this project, a survey for rare, unique, and <br />significant resources should be performed. <br />6. Allowing for narrower streets to minimize both wetland impacts and impervious <br />surface area could be considered. <br />7. Storm water pond(s) should be located in close proximity to wetland areas. <br />8. Storm water pond design should take into account the site's location in a highly <br />vulnerable area of the Drinking Water Supply Management Area. This may limit <br />infiltration possibilities on the site. <br />9. Recommend applicant performs a noise study for the site. <br />0 Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.