My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2020-036 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2020
>
2020-036 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2021 1:04:01 PM
Creation date
11/16/2020 12:35:43 PM
Metadata
Fields
Template:
City Council
Council Document Type
Resolutions
Meeting Date
04/13/2020
Council Meeting Type
Regular
Resolution #
20-36
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />• <br />relocations due to road reconstruction, which will be incorporated into the project bid documents. The <br />cost of the design, construction, and inspection of these features shall be the responsibility of the City. <br />The City's design of the sanitary sewer and water main utilities are to include signed plans, <br />specifications, and estimated quantities (using MnDOT Trns*port Item List Numbers) and cost. All <br />construction documents must be submitted to the County by May 20, 2020. <br />PERMITS: <br />The parties agree that the County will secure all necessary permits for this Project. The City agrees to <br />coordinate with the County in securing any permits required by the Rice Creek Watershed District, City <br />permits or variances, as well as any other permits or variances that may be required. The County also <br />requests that the City inform the County of any ordinances or city regulations that affect construction at <br />the time of the signing of this JPA. (e.g. setbacks, tree clearing ordinances, or any other city <br />ordinances.) <br />III. COSTS <br />The contract costs of the work, or if the work is not contracted, the cost of all labor, materials, <br />normal engineering costs and equipment rental required to complete the work, shall constitute the actual <br />"construction costs" and shall be so referred to herein. "Estimated construction costs" are good faith <br />projections of the costs, which will be incurred for this project. Actual costs will vary and those will be <br />the costs for which the relevant parties will be responsible. <br />The estimated construction cost of the project is $4,269,398.00. The total estimated construction <br />cost to the City is $476,534.50. State Aid funds have been allocated for this project. <br />The City participation in construction engineering will be at a rate of eight percent (8%) of their <br />designated construction share of $476,534.50. The estimated cost to the City for construction <br />engineering is $38,122.76. In summary, the total City share of this project is $514,657.26 (includes <br />construction and construction engineering costs). <br />For a detailed breakdown of the cost splits for this project see "EXHIBIT B". <br />Upon award of the contract, the City shall pay to the County, upon written demand by the <br />County, ninety five percent (95%) of its portion of the cost of the project estimated at $488,924.40. <br />Prior to billing, this estimate will be updated by the County to reflect the actual bid prices as awarded. <br />An updated cost estimate shall be provided to the City at the time of billing. The City's share of the cost <br />of the project shall include only construction and construction engineering expense and does not include <br />engineering design and administrative expenses incurred by the County. <br />Upon final completion of the project, the City's share of the construction cost will be based upon <br />actual construction costs. If necessary, adjustments to the initial ninety five percent (95%) charged will <br />be made in the form of credit or additional charges to the City's share. Also, the remaining five percent <br />(5%) of the City's portion of the construction costs shall be paid.. <br />IV. TERM <br />This Agreement shall continue until terminated as provided hereinafter. <br />V. DISBURSEMENT OF FUNDS <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.