My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2020-050 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2020
>
2020-050 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2021 1:01:28 PM
Creation date
11/16/2020 1:03:01 PM
Metadata
Fields
Template:
City Council
Council Document Type
Resolutions
Meeting Date
05/26/2020
Council Meeting Type
Regular
Resolution #
20-50
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />• <br />CITY COUNCIL <br />AGENDA ITEM 5B <br />STAFF ORIGINATOR: Diane Hankee, City Engineer <br />MEETING DATE: May 26, 2020 <br />TOPIC: Resolution No. 20-48, Accepting Quotes and Awarding a <br />Construction Contract, 12th Avenue Trail Project <br />VO I REQUIRED: 3/5 Vote Required <br />INTRODUCTION <br />Staff is requesting authorization to accept quotes and award the construction contract for the <br />12th Avenue Trail Project. <br />BACKGROUND <br />The City received resident requests to construct a trail along 12th Avenue. The Council directed <br />staff to prepare a preliminary design and cost estimates. The trail was discussed at City Council <br />work sessions throughout 2019 and as a result the City Council budgeted for this project within <br />their 2020 budget. Staff has requested quotes for the construction of the 12th Avenue Trail <br />project. <br />The 12th Avenue Trail Project includes construction of a new trail between White Oak Road and <br />the existing trail head approximately 720 feet south of White Oak Road, pedestrian ramp <br />improvements, and ditch grading and culvert repairs to facilitate drainage in the project area. A <br />location map is enclosed. The project is funded through the park and trail improvement fund in <br />the amount of $125,000 and through state aid in the amount of $25,000. <br />Quotes for the project were received on May 19th, 2020. <br />CONTRACTOR <br />TOTAL QUOTE <br />Allied Blacktop Co. <br />Did Not Quote <br />Asphalt Concrete Solutions <br />Did Not Quote <br />Bituminous Roadways Inc. <br />$150,703.30 <br />The engineers estimate for the project was $148,000.00 . The low bid was submitted by <br />Bituminous Roadways Inc. of Mendota Heights, MN in the amount of $150,703.30. The <br />completion date for this project is October 15th, 2020. <br />
The URL can be used to link to this page
Your browser does not support the video tag.