Laserfiche WebLink
ARPORATION/DELECTRIC <br />CO <br />"Since 1979" <br />1622 93rd Lane NE, Blaine, MN 55449 <br />t 763-571-7267 Ia 763-571-4735 <br />• Permit fee <br />Cost for above single point connection to each power supply (3-total) NTE: $2,100.00 <br />Grand total: $26,650.00 <br />Public works /senior center: <br />• Main Entry single man -door <br />• Garage and office doors (2) <br />• Garage steel door <br />• Exterior door requiring wire mold raceway for surface wiring <br />• Senior Center North Exit <br />• 2 — bathrooms Senior center <br />• 2 — bathrooms — shop <br />• Permit fee <br />Cost for above single point connection to each power supply (10-total) NTE: $7,340.00 <br />Pricing for the project.- <br />• Discounted labor for this project by $5.00 per hour so $110.00 instead of <br />$115.00/hr. due to the amount of labor. Overall discount rate <br />• Depending on pace of the project we will try to use apprentice labor whenever <br />feasible <br />Thank you, <br />Brian Kovar <br />President <br />brian(caidelectriccorp.com <br />• <br />• <br />• <br />