My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2020-105 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2020
>
2020-105 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2021 12:56:07 PM
Creation date
11/17/2020 7:12:27 AM
Metadata
Fields
Template:
City Council
Council Document Type
Resolutions
Meeting Date
09/14/2020
Council Meeting Type
Regular
Resolution #
20-105
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARPORATION/DELECTRIC <br />CO <br />"Since 1979" <br />1622 93rd Lane NE, Blaine, MN 55449 <br />t 763-571-7267 Ia 763-571-4735 <br />• Permit fee <br />Cost for above single point connection to each power supply (3-total) NTE: $2,100.00 <br />Grand total: $26,650.00 <br />Public works /senior center: <br />• Main Entry single man -door <br />• Garage and office doors (2) <br />• Garage steel door <br />• Exterior door requiring wire mold raceway for surface wiring <br />• Senior Center North Exit <br />• 2 — bathrooms Senior center <br />• 2 — bathrooms — shop <br />• Permit fee <br />Cost for above single point connection to each power supply (10-total) NTE: $7,340.00 <br />Pricing for the project.- <br />• Discounted labor for this project by $5.00 per hour so $110.00 instead of <br />$115.00/hr. due to the amount of labor. Overall discount rate <br />• Depending on pace of the project we will try to use apprentice labor whenever <br />feasible <br />Thank you, <br />Brian Kovar <br />President <br />brian(caidelectriccorp.com <br />• <br />• <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.