Laserfiche WebLink
• <br />• <br />• <br />This information along with traffic volumes, maintenance data, and geotechnical information is <br />used for the City's Roadway Capital Improvement Planning (CIP). In addition, based on these <br />ratings, staff is recommending a change to our specifications and maintenance strategies. We have <br />increased our pavement thickness on new construction and are eliminating seal coating as an interim <br />improvement. The higher upfront cost to developers will be offset by eliminating the seal coating <br />fee. Additional detail is included in the attached Memorandum from Lee Gustafson of W SB and <br />Associates. <br />The City plans to complete two projects in 2021, a Street Reconstruction Project funded primarily <br />with Street Reconstruction Bonds, and the City's annual Street Rehabilitation Project using <br />Pavement Management Funds. Water system maintenance will also be addressed where municipal <br />utilities exist. The proposed projects for 2021 are as follows: <br />2021 Street Reconstruction Project: <br />Full Depth Reclamation (approximately 2.2 miles) — Joyer Lane, Karth Road, Talle Lane, Canfield <br />Road, and Gaage Lane neighborhood roadways, and 4th Avenue (Main Street to Pine Street). The <br />estimated project cost is $2,600,000.00. <br />2021 Street Rehabilitation Project: <br />The estimated funding available for 2021, including a pavement fund balance carried forward and <br />next year's proposed budget of $711,112.00, is a total of $855,000.00. The proposed improvements <br />include: <br />Full Depth Mill and Overlay / Reclamation (approximately 0.6 miles) — Forsham Lake Drive, Post <br />Road, and Stage Coach Trail (from cul du sac north 1,400 feet). The estimated project cost is <br />$795,000.00 including water system repairs. <br />Thin Overlay (approximately 1.6 miles) — James Street, Knoll Drive, and Oak Lane. Thin overlays <br />are planned to address Problem roadways in need of reconstruction that the City cannot fund in the <br />short term. The estimated project cost is $170,000.00. This portion of the project will be bid as an <br />alternate to maintain project flexibility. <br />The estimated total project cost including contingency and overhead and proposed funding <br />sources are as follows: <br />Street <br />Reconstruction <br />Bonds <br />Pavement <br />Management <br />Fund <br />Water <br />Operating <br />Fund <br />Total <br />Project Cost <br />2021 Reconstruction <br />$2,600,000 <br />$2.600,000 <br />2021 Rehabilitation <br />$840,000 <br />$125,000 <br />$965,000 <br />Total Estimated Cost <br />$2,600,000 <br />$840,000 <br />$125,000 <br />$3,565,000 <br />Municipal State Aid funding may be available for the 2021 Reconstruction Project and will be <br />evaluated as part of the overall project funding. <br />