Laserfiche WebLink
. City of Lino Lakes - ZONING ORDINANCE <br />3. Each application for permit shall be accompanied by a fee, the amount of <br />which shall be determined by City Council resolution. <br />D. Conditions. The City Engineer or City Council, as a prerequisite to the granting <br />of a permit, may require the applicant or the owner of the premises to incorporate <br />and attach any conditions or restrictions that it deems necessary for the <br />preservation of health, welfare, and safety of the citizens: <br />1. Properly fence any pit or excavation, and barricade entrances to prevent <br />the general public from depositing garbage or refuse. <br />2. Slope the banks, and otherwise guard and keep any pit or excavation in <br />such condition as not to be dangerous because of sliding or caving banks. <br />3. Properly drain, fill, or level off any pit or excavation so as to make the <br />same safe and healthful as the permitting authority may determine. <br />4. Limit the depth of such excavation to an elevation no lower than the <br />minimum floor elevation for building construction as established by the <br />City Engineer, so as not to diminish development potential of the parcel. <br />s <br />5. Limit any fill material to clean fill, defined as rock, sand, gravel, clay, or <br />other like and similar non -decomposable material. Concrete, asphalt, <br />metal, wood, and other debris shall be prohibited. <br />6. Require that all decomposable material, or other unsuitable foundation <br />material, be removed from an area before deposition of fill begins. <br />7. Prepare a site plan showing existing and proposed grade elevations and <br />effect of storm water drainage on adjacent areas. <br />8. Specify a time when the excavation or land reclamation project shall be <br />completed. <br />9. Place a minimum of four (4) inches of top soil over the completed project <br />and establish appropriate ground cover within sixty (60) days of <br />completion. <br />10. Reimburse the City for the cost of periodic inspections by the City for the <br />purpose of determining that the terms under which the permit has been <br />• issued are being complied with. <br />3-65 <br />