My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2020-007 Council Ordinances
LinoLakes
>
City Council
>
City Council Ordinances
>
2020
>
2020-007 Council Ordinances
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2021 11:40:12 AM
Creation date
1/11/2021 2:04:45 PM
Metadata
Fields
Template:
City Council
Council Document Type
Ordinances
Meeting Date
11/23/2020
Council Meeting Type
Regular
Ordinance #
07-20
Ordinance Summary
Adopting 2021 Fee Schedule
Ordinance Date Passed
11/23/02020
Ordinance Date Published
12/01/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Water Meter <br />MXU Unit <br />Water Meter + MXU Unit <br />Touch Pad <br />Curb Stop Covers <br />Septic Installation or Repair Permit <br />Septic Pumping Permit <br />Demolition Permit <br />Lawn Sprinkler/Irrigation System Permit <br />Irrigating or Watering of New Landscaping Permit (Sod <br />or Seed) <br />Driveway Replacement Permit <br />Sign Permit: Existing Billboard <br />Sign Permit: Permanent <br />Sign Permit: Sandwich Board <br />Sign Permit: Temporary (portable/banner) <br />Storm Pond Aeration Permit <br />City Cost plus $50.00 <br />City Cost plus $50.00 <br />City Cost plus $50.00 <br />$ 18.00 <br />$ 70.00 <br />$ 250.00 <br />$ 10.00 <br />$ 69.00 <br />$ 69.00 <br />$ - No Fee <br />$ 69.00 <br />$ 85.00 /Year <br />See Building Fee Table <br />$ 25.00 <br />$ 25.00 /Term <br />$ 150.00 <br />Fee Refund — Per applicant request, City staff may refund permit fees up to 80% for voided permits. Plan review <br />fees and state surcharge fees are non-refundable. No refund shall be provided if permit has expired. <br />All permits issued are subject to applicable State surcharge fees. <br />Inspections made outside of normal business hours is a three-hour minimum charge. <br />Or the total hourly cost to the jurisdiction, whichever is greatest. This cost shall include supervision, <br />overhead, equipment, hourly wages, and fringe benefits of the employees involved. <br />Actual costs include administrative and overhead costs. <br />An escrow may be required, as determined by the City Engineer, to cover all costs incurred by the City for plan <br />revision and construction observation. <br />ESCROW DEPOSITS <br />In order to obtain a Certificate of Occupancy, escrow deposits shall be collected if exterior work cannot be <br />completed due to inclement weather, as determined by City Staff, whereupon a Temporary Certificate of <br />Occupancy would be issued subject to the execution of an escrow agreement and payment thereof. Any <br />unfinished work must be completed within six months (weather permitting) from the date of issuance. The <br />following escrow amounts are hereby established: <br />a. Driveway - $1,000.00 <br />b. Exterior Concrete - $1,000.00 <br />c. As -built Surveys - $1,000.00 <br />d. Stucco (final coat only) - $1,000.00 <br />e. Garage Floor - $1,000.00 <br />• <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.