My WebLink
|
Help
|
About
|
Sign Out
Home
Search
02/10/2021 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2021
>
02/10/2021 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2021 4:28:50 PM
Creation date
2/9/2021 8:30:15 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
02/10/2021
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The stormwater maintenance of this subdivision will be covered under the City's <br />Programmatic Maintenance Agreement. <br />FINDINGS OF FACT -FINAL PLAT <br />The Planning and Zoning Board shall consider the final plat and the Community <br />Development Department shall forward the Planning and Zoning Board <br />recommendations to the City Council. The following requirements shall be met before <br />consideration of the final plat by the Planning and Zoning Board: <br />1. The final plat shall substantially conform to the approved preliminary plat and <br />phasing plan. <br />The final plat substantially conforms with the preliminary plat. <br />2. For plats that consist solely of individual single family residential lots, final plat <br />applications for subsequent phases shall not be approved until building permits <br />have been issued for 40% of lots in the preceding phase. This division applies <br />only when the preceding phase consists of 40 or more lots; and <br />This is a two (2) lot single family residential subdivision and will be platted in one (1) <br />phase. <br />3. Conditions attached to approval of the preliminary plat shall be substantially <br />fulfilled or secured by the development agreement, as appropriate. <br />The conditions of the preliminary plat have been substantially fulfilled. Securities will be <br />required with a Development Agreement. <br />RECOMMENDATION <br />Staff recommends approval of the final plat for Bald Eagle Addition with the following <br />conditions: <br />1. The driveway to the third stall garage on 202 Elm Street shall be hard surfaced in <br />accordance with City Code on or before June 1, 2021. <br />a. A Zoning Permit is required. <br />2. The new house proposed on Lot 2, Block 1, Bald Eagle Addition is required to <br />connect to municipal water and sanitary services. <br />The following issues shall be addressed prior to grading: <br />1. All comments from City Engineer Letter dated January 25, 2021 shall be <br />addressed. <br />2. All comments from the Environmental Coordinator Memo dated January 25, 2021 <br />shall be addressed. <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.