My WebLink
|
Help
|
About
|
Sign Out
Home
Search
02-08-2021 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2021
>
Searchable Packets
>
02-08-2021 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2021 9:37:33 AM
Creation date
2/9/2021 11:04:34 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
02/08/2021
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
wsbl <br />January 29, 2021 <br />Mr. Michael Grochala <br />Community Development Director <br />City of Lino Lakes <br />600 Town Center Parkway <br />Lino Lakes, MN 55014 <br />Re: Proposal to Complete 2021 Street Improvement Project Construction <br />Inspection Services <br />Dear Mr. Grochala: <br />o WSB & Associates, Inc. is pleased to present this proposal to you for construction <br />U <br />administration and inspection services associated with the City's 2021 Street <br />Improvement Project. The project includes: <br />m <br />2021 Street Reconstruction Project: <br />Full Depth Reclamation (approximately 2.2 miles) — Joyer Lane, Karth Road, Talle Lane, <br />Canfield Road, and Gaage Lane neighborhood roadways, and 4th Avenue (Main Street to <br />Pine Street). The engineer's estimated construction cost is $1,699,000.00. <br />2021 Street Rehabilitation Project: <br />Full Depth Mill and Overlay / Reclamation (approximately 0.6 miles) — Forsham Lake Drive, <br />Post Road, and Stage Coach Trail (from cul du sac north 1,400 feet) and water system <br />2 repairs. The engineer's estimated construction cost is $520,000.00. <br />J <br />Thin Overlay (approximately 1.6 miles) — James Street, Knoll Drive and Oak Lane as a * <br />Bid Alternate. The engineer's estimated construction cost is $204,000.00. <br />a <br />Scope of Engineering Services <br />W The construction engineering services for the 2021 Street Improvement Project include <br />contract administration, municipal state aid reporting, construction observation, <br />construction staking, and construction coordination with adjacent landowners. Below is a <br />detailed description of the engineering services and WSB's proposed approach. <br />w <br />a. Project Management/Contract Administration <br />Contract Administration includes holding meetings with the contractor & City of Lino <br />Lakes (preconstruction & weekly construction), material tracking and measurement, <br />processing monthly quantities for pay vouchers, and resident communication. <br />S:\Community Development\Projects\Capital Improvement Projects\2020 Street Rehabilitation Project\Budget\WSB\Construction Services\20200303 Construction <br />Services Proposal.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.