Laserfiche WebLink
Z'KD A TOLTZ, KING, DUVALL, ANDERSON <br />AND ASSOCIATES, INCORPORATED <br />ENGINEERS • ARCHITECTS • PLANNERS <br />MEMORANDUM <br />To: Jim Studenski <br />Copies To: John Powell <br />From: Scott A. Brink <br />Date: June 26, 2002 <br />1500 PIPER JAFFRAY PLAZA <br />444 CEDAR STREET <br />SAINT PAUL, MINNESOTA 55101-2140 <br />PHONE.651/292.4400 FAX:651/292-0083 <br />Reference: Drainage Review for <br />Spirit Hills Center (Village Hillsl <br />City of Lino Lakes, Minnesota <br />Commission No. 12475-002 <br />The following documents, submitted on June 24, 2002, to the City of Lino Lakes, were used to <br />review the proposed Spirit Hills Center, Site, Grading, Drainage, and Erosion Control Plan <br />(Sheet 1 of 6): <br />1. Plan set dated February 13, 2002, revised June 21, 2002, and signed on June 21, 2002 <br />(full size and half size copies provided) <br />2. HydroCAD calculations dated June 20, 2002 <br />3. TKDA memorandum from Stephen Hartley dated May 1, 2002 <br />After reviewing the above documents, I have the following comments: <br />General Comments: <br />In order to provide for better understanding and clarification of the Plan, the following <br />information should be provided: <br />1. Grading notes should be numbered and referenced to and from the Plan accordingly. <br />2. It is not noted on the Plan whether the spot elevations provided are existing or proposed. <br />They are presumed to be proposed, but must be distinguished and stated clearly on the <br />Plan. There are some spots (particularly between buildings at the south end of the site) <br />that do not show clearly that they will drain. In addition, drainage flow direction should <br />be more clearly defined at the site entrances (i.e., drainage to Ware Road vs. on site, etc.) <br />3. Denotations on the Plan such as FL, FCL, LP, D etc., should be noted in a glossary or <br />0 index as to what they identify or stand for. <br />An Equal Opportunity Employer <br />