My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08_12_2002 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2002
>
08_12_2002 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2025 8:54:34 AM
Creation date
3/3/2021 2:39:31 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
08/12/2002
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Spirit Hills. <br />Page 8 of 9 <br />2. A sidewalk shall be installed along the frontage of Ware Road and shall be <br />maintained by the commercial development. <br />3. The PDO shall include the CUP'S for the Motor Fuel Station (Convenience Store), <br />Bank Drive-Thru and Day Care subject to the requirements of Section 7, Subdivision <br />3, H(2), H(5) and H(11), respectively of the Lino Lakes Zoning Ordinance. <br />B. Site and Building Plan approval to allow the construction of 30,266 square feet in three <br />buildings and canopy as configured on the site plan dated received June 14, 2002 <br />1. All refuse and recyclable materials shall be stored within the principal building or <br />within an accessory structure (within a side or rear yard) that is totally screened from <br />eye level view from neighboring uses and public rights of way. <br />2. All signs shall be reviewed with the sign permit applications and shall be required the <br />applicable requirements of the Ordinance. <br />3. Light fixture design is a solid dome variety only and under- canopy lighting shall be <br />submitted and subject to staff approval. <br />4. The submitted erosion and grading plan shall be revised to incorporate the City <br />is Engineer's comments, dated July 3, 2002. <br />5. The submitted utility plan shall be revised to incorporate the City Engineer's <br />comments, dated July 3, 2002. <br />6. Stop signs shall be installed and maintained at the access points with the public road. <br />7. The Rice Creek Watershed District issues a permit to allow the development proposal <br />and the conditions required by it are fulfilled. <br />8. A Watershed District Permit is received prior to City building permit issuance. <br />9. A final plat and vacation of easements shall be submitted and approved by the City. <br />The plat shall also include dedication of access control, along Birch Street, to Anoka <br />County. <br />10. Prior to the commencement of any site work, the applicant enters into a performance <br />agreement with the City and post all the necessary securities required by it. <br />11. No exterior audio system associated with the site. <br />12. Limiting hours of operations from 5:00 a.m. to 11:30 p.m. <br />0 <br />13. Subject to Anoka County traffic approval. <br />
The URL can be used to link to this page
Your browser does not support the video tag.