My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06/01/1987 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
1987
>
06/01/1987 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2021 8:41:06 AM
Creation date
3/12/2021 10:44:55 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
06/01/1987
Council Meeting Type
Work Session Special
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7,>ovE�2 <br /> See Proposed Assessment Roil . <br /> The proposed Assessment Roll is divided Into sections by date of proposed <br /> service for the sanitary sewer improvements and by trunk improvement area <br /> for watermain improvements. <br /> ' Asses Rates (July 1986 Base Rate) <br /> 1 . Sanitary Sewgrj <br /> Trunk Area Charge $821 .00/Acre D <br /> Trunk Connection Charge $201 . 10/Unit - Residential <br /> E201.10/R.E.U. - Commercial/Industr I <br /> Lateral Front Foot Charge $20.00/Front Foot <br /> AA <br /> 2. Water=I1� <br /> Trunk Area Charge $875.00/Acre <br /> Trunk Connection Charge $950.00/Unit - Residential <br /> $475.00/R.E.U. - Commercial/industrial <br /> or $4,750.00/Acre (whichever is greater) <br /> Lateral Front Foot Charge $20.00/Front Foot <br /> r (R.E.U. = Residential Equivalent Unit) <br /> Connection charges are based on 2.0 units/acre for residential ar s and <br /> most commercial/industr.ial areas, since many areas may be rezone . Known <br /> commerclal/industrial areas were charged higher rates. All rates and <br /> charges are subject to revision prior to final assessment. <br /> MAssessment rates are for the 1986 construction season and will be revised <br /> to ref lect 1 987 construction costs, based on the ENR Construction Cost <br /> Index, prior to the actual assessment. <br /> In addition to the assessments shown lateral assessments will be <br /> collected, but will depend on the final routing and future street layouts. <br /> Assessment areas for each property are based on gross buildable area. This <br /> includes street right-of-way but deducts land to the flood plain. All lots <br /> within a development are charged for the same area unless there is a <br /> significant difference in size and/or benefit. The assessable area does <br /> not necessarily relate to the actual measured area or legally described <br /> area. <br />_ -F- 8179 <br />
The URL can be used to link to this page
Your browser does not support the video tag.