My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2021-027 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2021
>
2021-027 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2021 12:40:09 PM
Creation date
3/23/2021 12:39:35 PM
Metadata
Fields
Template:
City Council
Council Document Type
Resolutions
Meeting Date
03/22/2021
Council Meeting Type
Regular
Resolution #
21-27
Resolution Title
Resolution Authorizing Preparation of Plans and Specifications for the 2021 Street Maintenance Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY COUNCIL <br /> AGENDA ITEM 6C <br /> STAFF ORIGINATOR: Diane Hankee, PE City Engineer <br /> C. C. MEETING DATE: March 22, 2021 <br /> TOPIC: 2021 Street Maintenance Project, Consider Resolution 21-27, <br /> Authorize the Preparation of Plans and Specs <br /> VOTE REQUIRED: 3/5 <br /> INTRODUCTION <br /> Staff is requesting Council authorization to prepare plans and specifications for the 2021 Street <br /> Maintenance Project. <br /> BACKGROUND <br /> The City's 2021 Pavement Management Program includes a Street Improvement Project and a <br /> Street Maintenance Project. The Council awarded the Street Improvement Project construction <br /> contract at the February 8, 2021 Council meeting. The Street Maintenance Project includes crack <br /> filling, seal coating,and applying a maltene-based asphalt rejuvenator. Seal coating is only being <br /> performed on roadways that already have been seal coated. The City is using rejuvenators on new <br /> roadways. The proposed maintenance project is as follows: <br /> Maltene-Based Asphalt Rejuvenator: <br /> Robinson Drive(from Sunset Avenue to approximately 115 Robinson Drive),Enid Trail, <br /> Pheasant Run S (from Od Birch Street to Birch Park entrance), Saddle Club Court,Fox <br /> Road(from Pheasant Run S to approximately 910 Fox Road),Black Berry Court,Killdeer <br /> Court(from Aspen Lane to the cul-de-sac),Red Oak Lane(from 20th Ave to Cypress <br /> Street),Cottonwood Avenue,Butternut Street,Dogwood Street, Cypress Street,Rosewood <br /> Lane, Chestnut Street,21'Avenue(from Chestnut Street to Cedar Street and from <br /> Commerce Drive to the cul-de-sac), 12th Avenue,Holly Drive(from County Road J to <br /> Cripple Creek Pass),Holly Court,Partridge Court, Woodchuck Circle,Woodchuck Court, <br /> Foxtail Drive,Foxtail Court, Sargent Court,Ash Street, and Bald Eagle Boulevard(from <br /> Ash Street to the eastern city limits). <br /> Seal Coating: <br /> Clearwater Creek Drive(from Cedar Street to Tart Lake Road), Clearwater Creek Court, <br /> Arthur Court,Clearwater Creek Cir, Tart Lake Road,Albert Court, and Tart Court. <br /> The estimated total project cost including contingency and overhead is $285,350. The project is <br /> funded through the Pavement Management Funds. <br />
The URL can be used to link to this page
Your browser does not support the video tag.