Laserfiche WebLink
CITY COUNCIL <br />AGENDA ITEM 6C <br /> <br />STAFF ORIGINATOR: Diane Hankee, PE City Engineer <br /> <br />C. C. MEETING DATE: March 22, 2021 <br /> <br />TOPIC: 2021 Street Maintenance Project, Consider Resolution 21-27, <br />Authorize the Preparation of Plans and Specs <br /> <br />VOTE REQUIRED: 3/5 <br /> <br /> <br />INTRODUCTION <br /> <br />Staff is requesting Council authorization to prepare plans and specifications for the 2021 Street <br />Maintenance Project. <br /> <br />BACKGROUND <br /> <br />The City’s 2021 Pavement Management Program includes a Street Improvement Project and a <br />Street Maintenance Project. The Council awarded the Street Improvement Project construction <br />contract at the February 8, 2021 Council meeting. The Street Maintenance Project includes crack <br />filling, seal coating, and applying a maltene-based asphalt rejuvenator. Seal coating is only being <br />performed on roadways that already have been seal coated. The City is using rejuvenators on new <br />roadways. The proposed maintenance project is as follows: <br /> <br />Maltene-Based Asphalt Rejuvenator: <br />Robinson Drive (from Sunset Avenue to approximately 115 Robinson Drive), Enid Trail, <br />Pheasant Run S (from Od Birch Street to Birch Park entrance), Saddle Club Court, Fox <br />Road (from Pheasant Run S to approximately 910 Fox Road), Black Berry Court, Killdeer <br />Court (from Aspen Lane to the cul-de-sac), Red Oak Lane (from 20th Ave to Cypress <br />Street), Cottonwood Avenue, Butternut Street, Dogwood Street, Cypress Street, Rosewood <br />Lane, Chestnut Street, 21st Avenue (from Chestnut Street to Cedar Street and from <br />Commerce Drive to the cul-de-sac), 12th Avenue, Holly Drive (from County Road J to <br />Cripple Creek Pass), Holly Court, Partridge Court, Woodchuck Circle, Woodchuck Court, <br />Foxtail Drive, Foxtail Court, Sargent Court, Ash Street, and Bald Eagle Boulevard (from <br />Ash Street to the eastern city limits). <br /> <br />Seal Coating: <br /> Clearwater Creek Drive (from Cedar Street to Tart Lake Road), Clearwater Creek Court, <br />Arthur Court, Clearwater Creek Cir, Tart Lake Road, Albert Court, and Tart Court. <br /> <br />The estimated total project cost including contingency and overhead is $285,350. The project is <br />funded through the Pavement Management Funds. <br />