My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04/14/2021 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2021
>
04/14/2021 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2021 12:38:34 PM
Creation date
4/9/2021 11:09:59 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
04/14/2021
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The foundation landscape requirements have not been met in terms of numbers or with <br /> respect to placement. <br /> Sod and Ground Cover Standards <br /> All areas not otherwise improved in accordance with the approved site plans shall have a <br /> minimum depth of 4 inches of topsoil and be sodded including boulevard areas. Seed <br /> may be provided in lieu of sod in certain cases, including when the area is adjacent to <br /> natural areas or wetlands. <br /> Area around the storm water pond from normal water level to high water level will be <br /> seeded with MnDOT 33-261, Stormwater South and West, which is a native mix of <br /> grasses, forbs, sedges, and rushes for stormwater pond edges. Above high water level in <br /> the storm water pond area calls for 35-621 Dry Prairie Southeast. <br /> The area north of Lot 1 will also have MnDot 35-621 to create a buffer strip for Wetland <br /> A near the impacted portion of the wetland. <br /> The remainder of the site will be seeded with MnDot 25-141 Mesic Roadside General or <br /> sodded. The Seeding Plan indicates this mix covering areas of the site that call for sod on <br /> the Landscape Plan. These two plan sheets should match. <br /> Sheet L1, Landscape Plan notes irrigation designed by others. An irrigation plan shall be <br /> submitted with the building permit. <br /> Boulevard Trees <br /> Boulevard trees are not required for commercial developments. <br /> Signage <br /> A comprehensive sign plan for the entire building is required for multi-occupancy <br /> business buildings. The comprehensive sign plan shall be submitted with the sign permit <br /> application for all wall and monument signs. Preliminary review of the ground <br /> monument signs indicates they meet size and height requirements. <br /> Ground signs are only allowed along public road frontage i.e. CSAH 14 (Main Street) <br /> and Otter Lake Road. <br /> Impervious Surface Coverage <br /> The allowed impervious surface coverage in the GB, General Business District is 75%. <br /> The lot area of Lot 1 is 1.46 acres with 1.07 acres impervious which equals 73%. The <br /> proposed post-development impervious surface coverage is compliant. <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.