Laserfiche WebLink
The applicant has provided an alternatives analysis, including discussion of impact <br /> avoidance, minimization and mitigation. The applicant has reasonably avoided and <br /> minimized wetland impacts to the extent possible. The applicant has addressed all <br /> comments and the TEP concurs that WCA impact sequencing is met. <br /> Wetland replacement will occur via wetland bank account#1522, in the amount of <br /> 1.5767 acres. The wetland bank is within the same major watershed and BSA of the <br /> project site. <br /> Impact/Mitigation Table <br /> Wetland Name Impact Amount Replacement Ratio Required <br /> MEN <br /> Wetland A 68,685 sf of fill 1:1 68,685 sf <br /> (1.5767 acres) (1.5767 acres) <br /> Wetland B 1,670 sf NA NA <br /> TOTAL 68,685sf 68,685 sf <br /> (1.5767 acres) (1.5767 acres) <br /> The wetlands are not within the Wetland Management Corridor(WMC) so a WMC <br /> wetland buffer is not required. <br /> A drainage &utility easement is being dedicated over the stormwater pond and a portion <br /> of the wetland. Additional easements will be dedicated in conjunction with future <br /> development of the outlots. <br /> Shoreland District <br /> The development is not located in the Shoreland District. <br /> Floodplain <br /> There is no FEMA floodplain on site. <br /> Public Safety Comments <br /> Deputy Director L'Allier notes a hydrant shall be located closer to the Fire Department <br /> Connector(FDC) on the north side of the building near the transformer. The hydrant has <br /> been relocated and approved by the Deputy Director. <br /> The Police Division reviewed the plans and had no issues that needed to be addressed. <br /> 12 <br />