Laserfiche WebLink
ws <br /> Memorandum <br /> To: Katie Larsen, City Planner, City of Lino Lakes <br /> From: Diane Hankee, City Engineer, City of Lino Lakes <br /> Date: April 7, 2021 <br /> Re: Otter Crossing <br /> Final Plat Review <br /> 16587-000 <br /> WSB has reviewed the Preliminary Plat and Utility Plans for the Otter Crossing development in <br /> Lino Lakes, MN, prepared by Pioneer Engineering received on July 20, 2020. Pioneer <br /> Engineering responded and sent updated plans March 11,2021. The following comments are <br /> based on review of the following plan sets and documents: <br /> 0 <br /> 0 DO Otter Crossing Final Plat& Site Plans prepared by Pioneer Engineering dated December <br /> z 16, 2020, revised March 1, 2021. <br /> m 00 Storm Water Management Plan prepared by Pioneer Engineering dated July 6, 2020, <br /> 0 <br /> revised March 5, 2021 <br /> 00 Stormwater Pollution Prevention Plan prepared by Pioneer Engineering dated March 5, <br /> Ln 2021 <br /> co DO Preliminary Geotechnical Exploration Report prepared by Haugo Geotechnical Services <br /> ao dated February 7, 2020, amended March 9, 2021 <br /> N <br /> cD The following review comments should be responded to in writing by the applicant. <br /> Pioneer Engineering responses to August 6, 2020, comments in Red. <br /> WSB responses in Blue. <br /> Engineering <br /> z <br /> • Grading <br /> a <br /> a The Otter Crossing development includes site grading for the private street, the proposed <br /> z building and parking lot, and the stormwater basin. <br /> a <br /> Comments: <br /> 0 <br /> 1. <br /> N <br /> W A-1 62 sen+eur en +he east si.Je A,f+he h ilr+in.. <br /> H <br /> The plans have been revised. The 918 contour ties in at the curb lino <br /> N <br /> 2 AnnliGan+shall chew the lera+ien of the NU/1 of Rosin 1 P. <br /> H <br /> W <br /> Stormwater Management <br /> 0 <br /> The stormwater on the site flows to three different locations from the site. The northern <br /> W section of the property drains to the northeast to an existing wetland area which then flows <br /> co to the north. The southern portion of the property drains to a large wetland toward the <br />