My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2021-033 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2021
>
2021-033 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2021 10:00:42 AM
Creation date
4/27/2021 10:00:37 AM
Metadata
Fields
Template:
City Council
Council Document Type
Resolutions
Meeting Date
04/26/2021
Council Meeting Type
Regular
Resolution #
21-33
Resolution Title
Resolution Order Project, Approve Plans and Specifications, and Authorize Advertisement for Bids for 2021 Street Maintenance Project
Resolution Date Passed
04/26/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY COUNCIL <br /> AGENDA ITEM 6A <br /> STAFF ORIGINATOR: Diane Hankee, PE City Engineer <br /> C. C. MEETING DATE: April 26, 2021 <br /> TOPIC: Consider Resolution 21-33, Order Project, Approve the Plans <br /> and Specifications and Authorize the Ad for Bid, 2021 Street <br /> Maintenance Project <br /> VOTE REQUIRED: 3/5 <br /> INTRODUCTION <br /> Staff is requesting Council approval to authorize the ad for bid for the 2021 Street Maintenance <br /> Project. <br /> BACKGROUND <br /> On March 22,2021,the City Council approved the preparation of the plans and specifications for <br /> 11) the 2021 Street Maintenance Project. The Street Maintenance Project includes crack filling and <br /> applying a maltene-based asphalt rejuvenator.The City is using rejuvenators on new roadways. <br /> Crack filling will be used on the rejuvenator roadways as well as roadways identified by city staff. <br /> The proposed maintenance project is as follows: <br /> Maltene-Based Asphalt Rejuvenator: <br /> Robinson Drive(from Sunset Avenue to approximately 115 Robinson Drive),Enid Trail, <br /> Pheasant Run S (from Od Birch Street to Birch Park entrance), Saddle Club Court,Fox <br /> Road(from Pheasant Run S to approximately 910 Fox Road),Black Berry Court,Killdeer <br /> Court(from Aspen Lane to the cul-de-sac),Red Oak Lane(from 20th Ave to Cypress <br /> Street),Cottonwood Avenue,Butternut Street, Dogwood Street,Cypress Street,Rosewood <br /> Lane, Chestnut Street,21'Avenue(from Chestnut Street to Cedar Street and from <br /> Commerce Drive to the cul-de-sac), 12th Avenue,Holly Drive(from County Road J to <br /> Cripple Creek Pass),Holly Court,Partridge Court, Woodchuck Circle,Woodchuck Court, <br /> Foxtail Drive,Foxtail Court, Sargent Court,Ash Street, and Bald Eagle Boulevard(from <br /> Ash Street to the eastern city limits). <br /> The estimated total project cost including contingency and overhead is $244,300. The project is <br /> funded through the Pavement Management Funds.Ash Street is shared road with Ramsey <br /> County and they have agreed to pay half the cost of roadway maintenance. 21 St Avenue is shared <br /> roadway with Centerville. During the development of the Clearwater Creek Business Park, <br /> where this section of 21'Avenue was constructed, street maintenance funds for this initial <br /> treatment were collected through the development agreement. <br />
The URL can be used to link to this page
Your browser does not support the video tag.