Laserfiche WebLink
<br /> <br /> <br />DATE: June 2, 2021 <br /> <br />TO: Park Board Members <br /> <br />FROM: Rick DeGardner, Public Services Director <br /> <br />RE: Parks Updates <br /> <br /> <br />A. Lino Park Renovations <br />Park maintenance staff removed all of the equipment and prepared the site for the installation of <br />the concrete work which included 265 feet of sidewalk, 200 feet of edging for the playground <br />container, and a bike rack pad. The tire swing ($300) and swing set ($500) are being sold on the <br />City website. <br /> <br />There have been significant production delays, resulting in the playground installation being <br />pushed back to late-June. The production facility experienced a major equipment failure in April <br />which brought production to a standstill for two weeks. That, along with a record year of orders, <br />has delayed delivery of the playground equipment. <br /> <br />Parks Department staff will be installing a concrete pad between the playground container and <br />trail. Two park benches and two picnic tables will be placed on the pad, which will also serve as an <br />ADA accessible ingress/egress point from the paved trail system. <br /> <br />Century Fence will be installing 118 lf of 4’ high ornamental fencing between the playground area <br />and parking lot. Also, a bottle filling station with bubbler (Elkay Model LK4408BF) has been <br />ordered and will be wall mounted on the irrigation shed, just north of the playground area. <br /> <br />Upon completion of the above items, we anticipate revisiting potential open-air park shelter, park <br />signage, and landscaping options. <br /> <br /> <br />B. Clearwater Creek Park Playground Replacement <br />Staff is in the process of soliciting bids for the demolition/removals of the playground equipment. <br />Its expected that the City will receive dollars, plus save a significant amount of staff time and <br />disposal costs. <br /> <br />Parks Department staff will install the new equipment with a certified playground installer this Fall. <br />