Laserfiche WebLink
Ms. Mary Kay Wyland <br /> October 6, 1994 <br /> Page 2 <br /> Sanitary Sewer and Water Main <br /> • Lift station at intersection of Street "A" and Cedar Street must be sized to comply with <br /> City staff study for this area. <br /> • Sanitary sewer in Street "A" must be sized to comply with City staff study for this area. <br /> • Water main in Street "A" must be sized to comply with City staff study for this area. <br /> • A municipal well must be constructed to provide water for this plat. The production <br /> goals for this well and the location must comply with the City staff study for this area. <br /> • We recommend that the water main in Street "A" be looped to connect with the water <br /> main in Street E along the south boundary of the plat. <br /> Streets and Storm Sewer <br /> • Compliance with City of Hugo storm water management plan must be proven. <br /> • Provide discharge control from southwest corner of Block 7 for waters exiting plat <br /> boundary. <br /> • Developer to provide us with surface water piping and ponding calculations. <br /> • Street "D" cul-de-sac has less than .5% slope around curb line. <br /> • Street "I" cul-de-sac has less than .5% slope around curb line. <br /> • Street "G" cul-de-sac has less than .5% slope around curb. <br /> If you have any questions concerning this review, please call me at 490-2081. <br /> Sincerely, <br /> Short Elliott Hendrickson Inc. <br /> _"d� F4N/ <br /> Steven F. Heth, P.E. <br /> tlo <br /> c: John Powell, City of Lino Lakes <br /> "� Don Volk, City of Lino Lakes <br />