My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11/07/1994 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1990 - 1998 Park Board Packets
>
1994 Park Board Packets
>
11/07/1994 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2021 3:55:09 PM
Creation date
6/4/2021 2:53:30 PM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
11/07/1994
Park Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Mary Kay Wyland <br /> October 6, 1994 <br /> Page 2 <br /> Sanitary Sewer and Water Main <br /> • Lift station at intersection of Street "A" and Cedar Street must be sized to comply with <br /> City staff study for this area. <br /> • Sanitary sewer in Street "A" must be sized to comply with City staff study for this area. <br /> • Water main in Street "A" must be sized to comply with City staff study for this area. <br /> • A municipal well must be constructed to provide water for this plat. The production <br /> goals for this well and the location must comply with the City staff study for this area. <br /> • We recommend that the water main in Street "A" be looped to connect with the water <br /> main in Street E along the south boundary of the plat. <br /> Streets and Storm Sewer <br /> • Compliance with City of Hugo storm water management plan must be proven. <br /> • Provide discharge control from southwest corner of Block 7 for waters exiting plat <br /> boundary. <br /> • Developer to provide us with surface water piping and ponding calculations. <br /> • Street "D" cul-de-sac has less than .5% slope around curb line. <br /> • Street "I" cul-de-sac has less than .5% slope around curb line. <br /> • Street "G" cul-de-sac has less than .5% slope around curb. <br /> If you have any questions concerning this review, please call me at 490-2081. <br /> Sincerely, <br /> Short Elliott Hendrickson Inc. <br /> _"d� F4N/ <br /> Steven F. Heth, P.E. <br /> tlo <br /> c: John Powell, City of Lino Lakes <br /> "� Don Volk, City of Lino Lakes <br />
The URL can be used to link to this page
Your browser does not support the video tag.