My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06/09/2021 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2021
>
06/09/2021 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2021 11:39:29 AM
Creation date
6/4/2021 3:08:52 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
06/09/2021
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.General Provisions VI <br /> (a) Properly fence any pit or excavation,and barricade entrances to prevent the general <br /> public from depositing garbage or refuse. <br /> (b) Slope the banks,and otherwise guard and keep any pit or excavation in such condition <br /> as not to be dangerous because of sliding or caving banks. <br /> (c) Properly drain,fill,or level off any pit or excavation so as to make the same safe and <br /> healthful as the permitting authority may determine. <br /> (d) Limit the depth of such excavation to an elevation no lower than the minimum floor <br /> elevation for building construction as established by the City Engineer, so as not to diminish <br /> development potential of the parcel. <br /> (e) Limit any fill material to clean fill,defined as rock,sand,gravel,clay,or other like <br /> and similar non-decomposable material. Concrete,asphalt,metal,wood,and other debris shall be <br /> prohibited. <br /> (f) Require that all decomposable material,or other unsuitable foundation material,be <br /> removed from an area before deposition of fill begins. <br /> (g) Prepare a site plan showing existing and proposed grade elevations and effect of <br /> storm water drainage on adjacent areas. <br /> (h) Specify a time when the excavation or land reclamation project shall be completed. <br /> (i) Place a minimum of four (4) inches of top soil over the completed project and <br /> establish appropriate ground cover within sixty (60) days of completion, or in a time period <br /> consistent with the City's stormwater management and pollution prevention plan. <br /> 0) Reimburse the City for the cost of periodic inspections by the City for the purpose of <br /> determining that the terms under which the permit has been issued are being complied with. <br /> (k) Implement the tree preservation plan. <br /> (1) In addition to an interim-eenflitienal use permit, the City Engineer may determine <br /> that permits in excess of twenty-five thousand(25,000)cubic yards require the applicant to conduct <br /> a neighborhood meeting and to notify affected property owners within one-quarter(1/4)mile. <br /> (m) Post a form of security and sum as the permitted authority may require,running to <br /> the City,conditioned to pay the City the cost and expense of repairing or cleaning any highways, <br /> streets,or other public ways within the City made necessary by the special burden resulting from <br /> transporting thereon by the applicant material to or from the site,the amount of such cost to be <br /> determined by the Council; and conditioned further to comply with all the requirements of this <br /> Ordinance and the particular permit,and to save the City free and harmless from all suits or claims <br /> 3-86 <br />
The URL can be used to link to this page
Your browser does not support the video tag.