My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06/09/2021 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2021
>
06/09/2021 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2021 11:39:29 AM
Creation date
6/4/2021 3:08:52 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
06/09/2021
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Traffic generated by a proposed development application is within the capabilities of <br /> the City when: <br /> a. If the existing level of service (LOS) outside of the proposed subdivision is A <br /> or B, traffic generated by a proposed subdivision will not degrade the level of <br /> service more than one grade. <br /> b. If the existing LOS outside of the proposed subdivision is C, traffic generated <br /> by a proposed subdivision will not degrade the level of service below C. <br /> c. If the existing LOS outside of the proposed subdivision is D, traffic generated <br /> by a proposed subdivision will not degrade the level of service below D. <br /> d. The existing LOS must be D or better for all streets and intersections <br /> providing access to the subdivision. If the existing level of service is E or F, <br /> the subdivision developer must provide, as part of the proposed project, <br /> improvements needed to ensure a level of service D or better. <br /> e. Existing roads and intersections providing access to the subdivision must have <br /> the structural capacity to accommodate projected traffic from the proposed <br /> subdivision or the developer will pay to correct any structural deficiencies. <br /> f. The traffic generated from a proposed subdivision shall not require City street <br /> improvements that are inconsistent with the Lino Lakes Capital Improvement <br /> Plan. However, the City may, at its discretion, consider developer-financed <br /> improvements to correct any street deficiencies. <br /> g. The LOS requirements in paragraphs a. to d. above do not apply to the I- <br /> 35W/Lake Drive or I-35E/Main St. interchanges. At City discretion, <br /> interchange impacts must be evaluated in conjunction with Anoka County and <br /> the Minnesota Dept. of Transportation, and a plan must be prepared to <br /> determine improvements needed to resolve deficiencies. This plan must <br /> determine traffic generated by the subdivision project, how this traffic <br /> contributes to the total traffic, and the time frame of the improvements. The <br /> plan also must examine financing options, including project contribution and <br /> cost sharing among other jurisdictions and other properties that contribute to <br /> traffic at the interchange. <br /> h. The City does not relinquish any rights of local determination. <br /> Pine Street is a major collector road. The existing road has structural design and <br /> capacity to accommodate traffic proposed by the commercial stables. <br /> 5. The proposed development shall be served with adequate and safe water supply. <br /> The Property is served by a private well that can serve the commercial stables. <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.