Laserfiche WebLink
DESIGN REVIEW BOARD ACTION(IF NECESSARYI: <br /> • Non required. <br /> DESIGN REVIEW BOARD ACTION DATE. N/A <br /> COUNCIL ACTION(IF NECESSARY): <br /> 7 <br /> • Approved <br /> COUNCIL ACTIONDATE.• .... endi all <br /> PROJECT IMPLEMENTATION STATUS:The following defines staff observations related to actual implementation. This includes issues raised <br /> (and resolved) during implementation, general observations, and project outcome. <br /> Low quote for moving the building came in at $2600. Engineering strongly recommends the use of frost footings. Staff contacted an <br /> engineering firm to cost estimate and draw specifications and plans for this work. the following list breaks this down: <br /> 1) Preliminary project review:$286.88 <br /> 2) Preliminary project survey:$304.70 <br /> 3) Prepare plans and specifications for concrete floor:$1700 <br /> 4) Provide construction staking and observation for concrete floor:$445.30 <br /> Coordinate with Geotechnical Engineering firm for site review:$963.12 - I i <br /> 5) Provide preliminary design information for future driveway access and sidewalk to shelter:$100 tX4✓ <br /> Estimated Total :$3800.00 <br /> PROJECT FINAL COMPLETION DATE.• ....pending .... <br /> /8N <br /> Park, Recreation&Forestry Coordinator Date <br /> Parks & Recreation Board 3 City of Lino Lakes <br />