My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10/05/1992 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1990 - 1998 Park Board Packets
>
1992 Park Board Packets
>
10/05/1992 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2021 3:44:03 PM
Creation date
6/18/2021 10:31:42 AM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
10/05/1992
Park Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DESIGN REVIEW BOARD ACTION(IF NECESSARYI: <br /> • Non required. <br /> DESIGN REVIEW BOARD ACTION DATE. N/A <br /> COUNCIL ACTION(IF NECESSARY): <br /> 7 <br /> • Approved <br /> COUNCIL ACTIONDATE.• .... endi all <br /> PROJECT IMPLEMENTATION STATUS:The following defines staff observations related to actual implementation. This includes issues raised <br /> (and resolved) during implementation, general observations, and project outcome. <br /> Low quote for moving the building came in at $2600. Engineering strongly recommends the use of frost footings. Staff contacted an <br /> engineering firm to cost estimate and draw specifications and plans for this work. the following list breaks this down: <br /> 1) Preliminary project review:$286.88 <br /> 2) Preliminary project survey:$304.70 <br /> 3) Prepare plans and specifications for concrete floor:$1700 <br /> 4) Provide construction staking and observation for concrete floor:$445.30 <br /> Coordinate with Geotechnical Engineering firm for site review:$963.12 - I i <br /> 5) Provide preliminary design information for future driveway access and sidewalk to shelter:$100 tX4✓ <br /> Estimated Total :$3800.00 <br /> PROJECT FINAL COMPLETION DATE.• ....pending .... <br /> /8N <br /> Park, Recreation&Forestry Coordinator Date <br /> Parks & Recreation Board 3 City of Lino Lakes <br />
The URL can be used to link to this page
Your browser does not support the video tag.