My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10/05/1992 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1990 - 1998 Park Board Packets
>
1992 Park Board Packets
>
10/05/1992 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2021 3:44:03 PM
Creation date
6/18/2021 10:31:42 AM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
10/05/1992
Park Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f • r. <br /> PLANNING & ZONING BOARD SEPTEMBER 9, 1992 <br /> Plat) and what is now being required of Park Grove. Some of <br /> the rules and regulations have changed in the recent past. <br /> City Engineer Schneider stated that from an Engineering <br /> standpoint, we would favor more lots to bear the costs of <br /> utilities. He added that the developer has cooperated with <br /> the drainage concerns for the site. <br /> MOTION: Tom Mesich recommended approval of the preliminary <br /> plat with the requirements outlined in the staff report of <br /> September 4, 1992 with the exception of #2 and the additional <br /> condition that <br /> Provision of an erosion control plan that includes the <br /> following items: <br /> 1. Provision of silt fences around disturbed areas <br /> susceptible to erosion until such time as the area <br /> is sodded. <br /> 2 . Sodding be provided for the entire yard or disturbed <br /> land prior to issuance of occupancy permits or within <br /> six months of construction occurring during winter months. <br /> 3 . Developer shall escrow a financial security for an <br /> amount 1. 5 times the cost of sodding all disturbed areas <br /> of land in the plat. <br /> 4. The Park Grove development contract will include these <br /> provisions for erosion control and security. <br /> Al Robinson seconded the motion. <br /> On Roll Call: Ayes - Gelbman, Landers, Mesich, Robinson <br /> Nays - Nordine, Slatten <br /> Motion carried. <br /> V. DISCUSSION ITEMS: <br /> A. Wenzel Farms - Townhomes <br /> This item was tabled until the next meeting of the P & Z <br /> Board. <br /> B. Clyde Rehbein - Mr. Rehbein advised the P & Z that he was <br /> interested in developing some property south of Baldwin Lake <br /> owned by the. Ayres Family. He presented two possible street <br /> layouts and discussed dedication of a portion of the area to <br /> the City for park purposes. The P & Z indicated that <br /> the cul de sac arrangement seemed better suited to the <br /> property and encouraged Mr. Rehbein to present a preliminary <br /> plat for their review. Sewer and water services are <br /> available to serve this property. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.