Laserfiche WebLink
Planning&Zoning Board <br /> June 9,2021 <br /> Page 7 <br /> Ms. Kendra Lindahl, Landform,presented a summary of Zoning Ordinance changes <br /> to the General Provisions section needed to comply with State Law, eliminate <br /> inconsistencies in the document,better reflect City goals and make the ordinance <br /> easier to read and understand. This is an initial draft of key concepts. The Planning <br /> &Zoning Board should review the draft changes recommended by staff and provide <br /> direction on any other desired changes. The direction will be incorporated into the <br /> full draft that will be presented later this year. <br /> Board Comments <br /> Chair Tralle asked if the wind and solar energy sections could be combined. <br /> Ms. Lindahl said City likes the idea of an alternate energy zoning section with <br /> subsections for solar and wind if the board agrees. Currently the City has been <br /> allowing solar projects. <br /> Mr. Laden asks how solar and wind could be combined in the zones. He feels solar <br /> can go just about anywhere but wind needs to have more restrictive requirements. <br /> Ms. Lindahl agrees with Mr. Laden and clarifies wind and solar would be under the <br /> same section, subsections would clarify the differences with both. <br /> Chair Tralle comments on solar gardens taking land out of taxable property and asks <br /> if the same would be true of wind. V <br /> Ms. Lindahl clarifies that this does not refer to a wind farm but rather refers to a wind <br /> accessory to a structure. A single facility not exceeding 5,000 kilowatts. Staff is <br /> referring to a home or business. <br /> r. Root asks what the current standard zoning on solar power arrays are. <br /> Ms. Lindahl said that if asked to prepare a solar ordinance for review there are three <br /> different solar patterns that would be considered which are building integrated, <br /> building mounted, and ground mounted solar arrays. A review would also consider <br /> more technical aspects such as reflection proof covers and the panels ability to move. <br /> Mr. Root points out that a 5-megawatt wind structure would need a mounting pole of <br /> 120ft high and would have a blade diameter of 140ft. Because of this he would like <br /> any wind ordinance proposal to have differing standards for different zones. He <br /> would also like any zoning proposal to anticipate common issues with wind power <br /> such as shadow flickering and noise. <br /> Ms. Lindahl stated that they did draft a free standing WECS which cannot exceed 50 <br /> ft in height as measured from the grade at the base of the tower to the highest possible <br /> extension of the blades. She commented that setbacks were also addressed by saying <br /> the tower must be able to fall over and not hit the lot line. <br /> DRAFT MINUTES <br />