Laserfiche WebLink
TRAIL PAVING SUMMARY 9 of 7 <br /> The following trails are funding from 1996, 1997 Dedicated <br /> Park Funds($30,000) and CDBG Funds ($15,000) <br /> less -$2,500 for bridge at Wenzel Farms <br /> Trail ID Location Cost Sum Cost <br /> Z +�•► 1996-E-7-Marshan $6,041.00 $6,041.00 <br /> 3 — 1996-I-j Birch $2,738.00 $8,779.00 <br /> --• 1996-J-,f Birch $1,137.00 $9,916.00 <br /> S —1996-K Birch $2,631.00 $12,547.00 <br /> 1996-L .6 Birch $5,807.00 $18,354.00 <br /> ? ° 1996-H Fox Rd $2,983.00 $21,337.00 <br /> `■`A Lilac St $4,469.50 $25,806.50 <br /> +•• B-Seniors Elm St $2,191.00 $27,997.50 <br /> +.rR H Country Lakes Prk $8,726.00 $36,723.50 <br /> I Timberwolf Tr. $1,175.00 $37,898.50 <br /> $4,569.00 $42,467.50 <br /> subtotal $42,467.50 <br /> The following trails are funded by $16,00 DNR Grant <br /> ..s C Aqua Lane $8,325.00 $8,325.00 <br /> Lake Drive $7,675.00 $16,000.00 <br /> Page 1 <br />