Laserfiche WebLink
• 't <br /> Park Board <br /> Goal Setting Meeting <br /> October 16, 1996 <br /> Marty passed out documents from the 1995 and 1996 goal setting <br /> meetings . He said staff has been doing pretty good at meeting <br /> the parks facilities and recreation goals that have been set . <br /> He then went through the 1996 goals . $60, 000 . 00 was set aside <br /> for trails and Marty reported the trail bids came in at about <br /> $ .56/foot . He said we will get as much done, as we can, with the <br /> money that was set aside for this . <br /> Marty said there is a problem with the slope of the trail between <br /> Birch Park and Trappers Crossing. The contractor is either going <br /> to have to do a lot of filling or they will have to move the <br /> location. <br /> The residents by City Hall Park have been meeting and have <br /> decided what they would like in this park. The playground <br /> equipment is scheduled to be raised in May of 1997 . <br /> Marty said no money had been earmarked for the Athletic Complex <br /> in 1996 . <br /> n <br /> Quail Ridge base map has been completed for this park. He will <br /> get it to Brauer and Associates . He said they went out and <br /> probed the crossing area between Captains Place and Quail Ridge <br /> and the peat is 6-9' deep so a standard boardwalk plan will not <br /> work. May have to look at a floating boardwalk of some type . <br /> This costs about $50 per foot . <br /> Amy wanted to know if there was a liability issue with the peat <br /> in this park. Will the city have to do sometype of a disclaimer. <br /> Marty said he will contact the City' s risk management company <br /> about this . <br /> There is still money left to move the trail in Country Lakes <br /> Park. Marty said he needs to get a letter and description to <br /> Kate Drewry on how much we need to fill to get the trail done . <br /> George asked if this trail will be paved this year. Marty <br /> responded no. <br /> Marty said there was no money allocated for Clearwater Creek in <br /> r� <br /> 1996 . <br /> The boardwalk in Brandywood has been done for a cost of <br /> approximately $25/foot . The quote was for approximately <br /> $85/foot . Marty' s staff did a very good job on the boardwalk. <br /> 2 <br />