My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05/04/1998 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1990 - 1998 Park Board Packets
>
1998 Park Board Packets
>
05/04/1998 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2021 2:55:16 PM
Creation date
7/9/2021 2:57:56 PM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
05/04/1998
Park Bd Meeting Type
Regular
Park Bd Publication Type
Other
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Planning&Zoning Board <br /> April 8, 1998 <br /> Page 11 <br /> 11. Move temporary cul-de-sac back within 50'-75' of the west property line. <br /> 12. Add a buffer in the form of trees on the north end. <br /> 13. Change condition#8 from 20' to 15'. <br /> Chair Schaps then asked if the variances should be done individually and Mr. Brixius <br /> stated that they could be grouped, but separate from the plat approval. <br /> Mr. Dunn made a MOTION to approve preliminary plat for Glen Rehbien Companies, <br /> pursuant to the conditions as revised, and was supported by Mr. Johnson. Motion carried <br /> 6-0, with Mr. Corson abstaining. <br /> Mr. Johnson made a MOTION to approve variances for cul-de-sac length, block length, <br /> and street right-of-way, for Glen Rehbien Companies and was supported by Mr. <br /> Robinson. Motion carried 6-0, with Mr. Corson abstaining. <br /> D. PUBLIC HEARING, Village Plat II, Preliminary Plat, south/east corner of I- <br /> 35W and Lake Drive <br /> Chair Schaps declared the public hearing open at 7:47 p.m. <br /> Ms. Wyland explained that the City is requesting review and approval of the Village No. <br /> 2. This plat consists of a replat of a portion of the Village No. 1 with the addition of the <br /> recently acquired County parcel intended to house the City Complex, future community <br /> center(YMCA) and village green. To facilitate construction of the City Complex, a <br /> platting of the parcel is required. The plat will consist of one lot, Lotl, Block 1 which is <br /> 9.64 acres in size, and one outlot, Outlot A which is 18.4 acres in size. As future <br /> development occurs the outlot will be replatted. The lot dimensions and area meet the <br /> requirement of the PSP Zoning District. <br /> Ms. Wyland stated that the City's Engineering Consultant, OSM, has reviewed the plat to <br /> insure the proposed extension of Town Center Parkway will fit within the design of the <br /> current roadway. The current roadway configuration is 80' to accommodate a landscaped <br /> median, the extension will not contain a median and is therefore proposed at 60' in width. <br /> Drainage plans have been developed for the site and permit approval from the Rice Creek <br /> Watershed District is expected on Wednesday April 8. Easements will be provided over <br /> all wetlands as is required by our ordinances. <br /> Staff recommended approval of this preliminary plat, with the following conditions: <br /> 1. Easements are provided as per the City Subdivision Ordinance along lot lines and <br /> .-� wetlands/drainage ways. <br />
The URL can be used to link to this page
Your browser does not support the video tag.