My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05/04/1998 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1990 - 1998 Park Board Packets
>
1998 Park Board Packets
>
05/04/1998 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2021 2:55:16 PM
Creation date
7/9/2021 2:57:56 PM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
05/04/1998
Park Bd Meeting Type
Regular
Park Bd Publication Type
Other
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1/2 Court Basketball 8,650 Playground Equipment(Replace) 30,000 <br /> Picnic Tables(2) 600 %Court Basketball 8,650 <br /> Park Benches(2) 450 Park Benches(2) 450 <br /> Concrete 100 Concrete 100 <br /> Internal Trails Picnic Tables(2) 600 <br /> Miscellaneous 10,000 Site Work <br /> Site Grading and Prep Turf, Fencing? <br /> Aglime? <br /> Total Mafshan ; 49,800 Total Shenandoah $ 39,800 <br /> Sunrise <br /> Pheasant Hills(Ded$46,500) <br /> Complete Internal Trails Bleachers(5 row x 21 feet) 3,200 <br /> Class V and Bit.(560 ft) Concrete 275 <br /> Bituminous(380 ft) 3,650 In-Line Skating Rink 18,000 <br /> %Court Basketball 8,650 Replace Backstops(2) 6,000 <br /> Horseshoes 950 Player Benches(4) 1,100 <br /> Landscaping 5,000 Concrete 460 <br /> Park Benches(2) 450 Irrigation 5,000 <br /> Concrete 100 <br /> Picnic Tables(2) 600 Total Sunrise $ 34,035 <br /> Bridge 7,000 <br /> Overlook Sitting Area 6,000 <br /> Sunset Oaks <br /> Total Pheasant Hills $ 32,400 %Court Basketball 8,650 <br /> Landscaping 5,000 <br /> Quail Midge (Leveling,Seeding,Trees) <br /> Contingency/Design/Engineering 34,000 Picnic Tables(2) 600 <br /> Playground Equipment(New) 30,000 Park Benches(2) 450 <br /> Site Prep/Landscaping 35,000 Concrete 100 <br /> Trails(1700 ft) 19,000 <br /> %Court Basketball 8,650 Total Sunset Oaks $ 14,800 <br /> Horseshoe 950 <br /> Site Amenities 15,000 <br /> Deck Overlook 8,000 Wenzel Farms <br /> Replace Boardwalk(165 ft) 24,000 Landscaping 600 <br /> Workout Station 4,500 <br /> Boardwalk-New 22,000 Total Wenzel Fanns $ 600 <br /> Total Quail Ridge ; 201,100 <br /> Woods of Baldwin Lake <br /> Rice Lake Est.(Ded$62,000) <br /> Playground Equipment(New) 35,000 Total Woods of Baldwin <br /> Complete Internal Trails 35,000 <br /> Tennis Court 28,000 <br /> %Court Basketball 8,650 Woolans Park <br /> Park Benches(2) 450 Park Benches (2) 450 <br /> Concrete 100 Concrete 100 <br /> Site Grading and prep <br /> Total Woolans $ 550 <br /> Total Rice Lake Estates $ 107,200 <br /> Shenandoah(Remaster Plan?) Rice Lake Elementary <br /> Internal Trails? Tennis Courts(2) 56,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.