My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04/06/1998 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1990 - 1998 Park Board Packets
>
1998 Park Board Packets
>
04/06/1998 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2021 1:33:03 PM
Creation date
7/9/2021 3:14:46 PM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
04/06/1998
Park Bd Meeting Type
Regular
Park Bd Publication Type
Other
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J C JOHNSON CONSULTANTS, INC. <br /> e : 6601 - 75th Ave. N. Phone: (612) 566-6158 <br /> Brooklyn Park, MN 55428-1429 Fax: (612) 566-4374 <br /> March 31, 1998 <br /> Mr. Rick DeGardner <br /> Parks and Recreation Director <br /> City of Lino Lakes <br /> 7204 Lake Drive <br /> Lino Lakes, MN 55014 <br /> Dear Mr. DeGardner: <br /> Re: Park plan options for 8.6± acre park area west of Laurie & south of <br /> Mr. Gary Uhde requested that I submit the following comments and attached exhibits for <br /> review and discussion by the Parks Board at its April 6, 1998 meeting. The construction of <br /> Behms Century Farm 4th Addition is commencing and therefore it is suggested that it is <br /> timely to begin to discuss the park development needs for the 8.6± acres of land owned by <br /> the City. <br /> The park area currently has street frontage of over 1225 lineal feet along Laurie and Thomas <br /> Ave which brings about a cost impact to the City for the improvements to the existing <br /> streets. There appears to be three basic options to the City: 1) Do nothing, 2) sell a portion <br /> of the land abutting Laurie or 3) develop a portion of the land abutting Laurie and sell the <br /> finished lots. The following is a summary of the estimated cost impacts for these options. <br /> PLAN 1 - Do Nothing <br /> The "Do Nothing" option has cost impacts which were developed in the City's Feasibility <br /> Report for Trunk Sewer & Water prepared by OSM on November 21, 1997. The report <br /> estimated the City's cost for trunk sewer area & unit, trunk water area & unit, lateral sewer, <br /> lateral water and storm water management fees as $122,584.27. This amount is based on the <br /> 1997 typical rates. This amount is estimated to increase to $123,161.27, if 1998 rates are <br /> used. In addition to the above, the estimated costs for paving and storm sewer improvements <br /> at the typical rates is $61,560.00, for a total of $184,144.27 (1997 rates) and $184,721.29 <br /> (1998 rates). <br />
The URL can be used to link to this page
Your browser does not support the video tag.