My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10/05/1998 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1998 Park Board Packets
>
10/05/1998 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2021 3:46:34 PM
Creation date
7/23/2021 10:08:31 AM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
10/05/1998
Park Bd Meeting Type
Regular
Park Bd Publication Type
Other
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sep 28 98 02: 38p Mattke Engineering, Inc. 6127830300 p. 1 <br /> Mattke Engineering, Inc. <br /> 7671 Central Ave. N.E. Fridley, MN 55432 (612) 783-0300 <br /> v'":-0C. <br /> September 28 1998 <br /> City of Lino Lakes <br /> C/O Ms. Wyland <br /> 1189 Main Street <br /> Lino Lakes, MN 55014 <br /> re: WEST SHADOW PONDS (West Shadow Lake Road Extension) --Park Dedication <br /> Dear Ms. Wyland; <br /> This is to confirm our understanding regarding park dedication for the above project -- that the <br /> dedication was fulfilled with the MILLERS SOUTH GLEN project. <br /> Our park dedication requirements for both MILLERS SOUTH GLEN and WEST SHADOW <br /> PONDS (up to 12.6 acres of upland) were met with the park land dedicated to the City for <br /> expansion of Birchwood Park (see Mattke Engineering, Inc. letter dated January 29, 1997). Our <br /> most recent sketch plan for WEST SHADOW PONDS, dated 9/17/98, incorporates comments <br /> received from the Planning Commission, including elimination of the temporary cul-de-sac and <br /> constructing West Shadow Lake Road all the way to 62nd Street), and shifting West Shadow <br /> Lake Road further east at 62nd Street. The proposed project will have approximately 10.3 acres <br /> of upland. Consequently the project park dedication requirements are met by the land dedication <br /> provided for this project. <br /> As the trail dedication, it is anticipated that the Park Board will require construction of the trail <br /> into Birchwood Park along the north side of the plat as part of this project. <br /> Sincerely <br /> r 0 <br /> Tedd W. Mattke, P.E. <br /> • Residential & Commercial Development <br /> Hydrology • Water Resources • Municipal <br />
The URL can be used to link to this page
Your browser does not support the video tag.