Laserfiche WebLink
Fire Protection <br /> Arrow Sprinkler 116,152.00 <br /> Superior Fire Protection 167,025.00 <br /> Fire Guard Sprinkler 16900.00 <br /> Midwest Fire Protection 196,792.00 <br /> Electrical <br /> Gephart Electric 587,900.00 <br /> Wright Electric 683,600.00 <br /> Phasor Electric 714,000.00 <br /> Ridgedale Electric 735,000.00 <br /> J.W. Koehler 789,000.00 <br /> Mendota Electric 818,626.00 <br /> Bloomington Electric 829,000.00 <br /> AND WHEREAS, it appears that Midwest Asphalt is the lowest responsible bidder for <br /> asphaltic paving; and <br /> Adolfson&Peterson Construction is the lowest responsible bidder for concrete and <br /> masonry; and <br /> n <br /> Listul Industries, Inc., is the lowest responsible bidder for structural steel - erection; and <br /> Haldeman-Homme,Inc. is the lowest responsible bidder for casework; and <br /> Jorgenson Construction is the lowest responsible bidder for general construction; and <br /> M.G. McGrath,Inc. is the lowest responsible bidder for roofing;and <br /> W.L. Hall Company,Inc. is the lowest responsible bidder for aluminum windows/doors; <br /> and <br /> Olympic Wall Systems is the lowest responsible bidder for drywall; and <br /> Grazzini Brothers Company, Inc. is the lowest responsible bidder for tilework; and <br /> Twin City Acoustics is the lowest responsible bidder for acoustical ceilings/wall panels; <br /> and <br /> Floors by Becker is the lowest responsible bidder for flooring; and <br /> Wasche Commercial Finishes, Inc. is the lowest responsible bidder for painting; and <br /> J&F Equipment, Inc. is the lowest responsible bidder for lockers; and <br />