My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10/05/1998 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1998 Park Board Packets
>
10/05/1998 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2021 3:46:34 PM
Creation date
7/23/2021 10:08:31 AM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
10/05/1998
Park Bd Meeting Type
Regular
Park Bd Publication Type
Other
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COUNCIL MINUTES AUGUST 10, 1998 <br /> necessary lien waivers and withholding affidavits have been submitted to staff thereby meeting <br /> the requirements of the construction contract. <br /> Mr. Ahrens indicated the project included the paving of certain trails throughout the City and <br /> construction of a trail along the north side of Aqua Lane. Also, wear course paving was done in <br /> new developments. The final contract amount is summarized as follows: <br /> Original Bid Amount $185,665.25 <br /> Change Order No. 1 $ 15,234.33 <br /> Change Order No. 2 $ 14,122.50 <br /> Final Contract Amount $215,022.08 <br /> Mr. Ahrens referred to a memorandum from John Powell, TKDA, Inc., which discuss the change <br /> orders in detail. Change Order No. 1 is a compensating change order for quantity <br /> overrun/underruns. The trail construction along Aqua Lane resulted in quantity increases as a <br /> result of poor subbase materials that were exposed during construction. <br /> Change Order No. 2 is a result of the construction observer noting that the existing rubberized <br /> seals used on manhole adjustment rings and castings was not sufficient to properly seal the rings <br /> and casting. Since the rings and casting are areas where a significant amount of infiltration can <br /> occur or sand washing between the rings, staff directed the contractor to install additional <br /> rubberized seals to prevent any infiltration of water or sand. <br /> In both change order cases,the problems encountered were not anticipated and it was only after <br /> work had begun and the materials exposed that the construction observer noted problems that <br /> required correction. If the design of the project had anticipated the poor soils and deficient seals, <br /> the resulting contract amount would be nearly equal to the final amount noted above. <br /> Staff recommended adoption of Resolution No. 98 - 127. <br /> Mayor Sullivan asked if the change orders would be approved under the new Change Order <br /> Policy. Mr. Ahrens stated it would have been difficult to bring before Council for approval prior <br /> to executing the change orders. <br /> Council Member Lyden moved to adopt Resolution No. 98 - 127, as presented. Council Member <br /> Bergeson seconded the motion. Motion carried unanimously. <br /> Resolution No. 98 - 127 can be found at the end of these minutes. <br /> Consideration of Resolution No. 98 - 128,Approve Payment No.2 (Final) and Change <br /> Order No. 1, Elm Street Traffic Signal- Mr. Ahrens stated the contractor for the Elm Street <br /> Traffic Signal Project is requesting City approval of payment No. 2 (final) in the amount of <br /> n $5,334.35 including change order No. 1. All necessary lien waivers and withholding affidavits <br /> have been submitted to staff thereby meeting the requirements of the Construction Contract. <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.