Laserfiche WebLink
COUNCIL MINUTES JUNE 22, 1998 <br /> approval of the concept plan and that the applicant be directed to address the following issues <br /> prior to submission of a development plan application: <br /> I. Redesign of the site plan in consideration of the following factors: <br /> * Cluster stand alone buildings around shared parking lots. <br /> * Reduce the number of access to the Apollo Drive extension. <br /> * Consideration for the location of a proposed village bridge. <br /> * Provide at minimum one loading area per structure. <br /> * Provide sufficient stacking space and a by-pass lane in association with <br /> proposed drive through. <br /> * Provide right-in only from Apollo Drive extension to loading area on north <br /> side of 72,000 square foot structure with access to Apollo Drive near Lake <br /> Drive intersection via a defined access road. <br /> * Include more pedestrian circulation opportunities throughout the <br /> �.� development. <br /> * Provide a 50 feet principal building setback from Apollo Drive. <br /> 2. Resolve location of Apollo Drive/77th Street intersection. <br /> 3. Accesses to development from Lake Drive should compliment interior site <br /> circulation. <br /> 4. Reduce parking stall supply to_a number more approximate to the estimated <br /> parking stall requirement outlined herein. <br /> 5. Explore alternative options for reducing the number of required parking stalls and <br /> methods of construction as suggested by the Environmental Review Board. <br /> 6. Indicate provision of significant landscaping along north property line of Phase I <br /> to screen loading areas of the 72,000 square foot building. <br /> 7. Address the infiltration issues identified by the Environmental Review Board. <br /> 8. Coordinate a tree preservation plan with the City Forester. <br /> 9. Comments of other City Staff. <br /> 9 <br />