My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08/03/1998 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1998 Park Board Packets
>
08/03/1998 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2021 3:27:27 PM
Creation date
7/23/2021 10:40:11 AM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
08/03/1998
Park Bd Meeting Type
Regular
Park Bd Publication Type
Other
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lino Lakes Parks and Recreation Department <br /> 7204 Lake Drive <br /> C_ I T O F Lino Lakes, MN 55014 <br /> N KE (651) 780-1885 FaX (651) 784-7227 <br /> SNOW REMOVAL - TRAILS POLICY <br /> PURPOSE: <br /> The City of Lino Lakes maintains over 11 miles of trails for the enjoyment of Lino Lakes <br /> residents. The Parks and Recreation Department is responsible for the snow removal <br /> from trails. Every attempt will be made to provide a safe and enjoyable trail surface. <br /> This policy has been developed based upon the recognition that there are limited <br /> community resources. It also recognizes the inherent nature and variability of winter <br /> conditions. <br /> DESCRIPTION: <br /> The following is the trail snow removal policy: <br /> 1. Trail plowing will begin when the snow depth exceeds 2 inches or the snow has <br /> subsided. <br /> 2. Recognizing limited resources, trail clearing will occur during regularly scheduled <br /> shifts, Monday through Friday. Overtime will not be expended to clear trails during <br /> non-work hours. Scheduled work hours may be adjusted if resources permit. <br /> 3. Areas where snow must be hauled away will wait until additional personnel and <br /> equipment is available to assist. <br /> 4. Maintenance staff will attempt not to clog residential driveways. The operator will <br /> not clear areas that are blocked or drifted in as a result of the snow clearing <br /> operations on designated trails. <br /> 5. The City will not repair minor sod damage as a result of plowing or blowing. Sod <br /> replacement will be done at the discretion of the Parks and Recreation Director. <br /> 6. The City will not be responsible for sand removal or salt damage from snow that <br /> has been moved from roadways to trails to yards. <br /> 7. Breakdown of equipment will result in stoppage of this program until repairs are <br /> made. Every attempt will be made to continue the program after the repairs are <br /> made. <br /> 8. Due to mechanical limitations of equipment and trail irregularities, trails will not be <br /> cleared or maintained at dry pavement level. Materials such as sand and salt will <br /> not be used. Surface irregularities and slippery conditions may result. <br />
The URL can be used to link to this page
Your browser does not support the video tag.