Laserfiche WebLink
Lino Lakes Parks and Recreation Department <br /> 7204 Lake Drive <br /> C I T "' 0 F M Lino Lakes, N 55014 <br /> Y ��� <br /> N KE (651) 780-1885 Fax (651) 784-7227 <br /> June 1, 1999 <br /> TO: Park Board Members <br /> FROM: Rick DeGardner, Public Services Director <br /> SUBJECT: 1999 Trail Paving Projects <br /> In preparation for preparing the 1999 trail paving projects, I want to review the proposed trail <br /> projects with the Park Board. The Park Board has designated $20,000 to park dedication fund <br /> and there is $15,000 from the general fund. <br /> 1. Lilac Avenue from Mustang Lane to ARpaloosa Lane <br /> Approximately 1,400 feet. Sub-base already prepared with completion estimate of$8,000. <br /> n 2. Rice Lake Estates trail to Baldwin Park <br /> This trail was completed last month. Park dedication dollars were allocated in 1998 for this <br /> trail segment. <br /> 3. Trail West of Linda Lane <br /> An existing trail was constructed outside of the trail easement. This will require removing a <br /> portion of the trail and constructing the trail in its proper location. <br /> 4. Trail Restoration and Repair <br /> There are numerous trail segments in need of repair. This includes numerous culverts that <br /> have heaved and will need to be replaced. <br /> Other Pending Trail Projects: <br /> 1. Trappers Crossing to Birch Park <br /> I have been in contact with the property owner's attorney regarding the acquisition of land to <br /> proceed with this trail connection. I have not received a response whether the property <br /> owner is willing to negotiate. <br /> 2. Mallard Lane <br /> I am currently working with Anoka County Parks and Recreation in designing a trail segment <br /> from Mallard Lane to the Regional Parks Reserve trail system. I have not yet heard if we <br /> have been awarded a DNR Grant for trail connections to the Regional Parks trail system. <br /> 3. Wenzel Farms Trail <br /> $15,000 has been designated for the design and construction of the pedestrian bridge. <br /> Estimated construction costs for the trail are $23,000. <br /> sw/parkbrd/1999 Trail Paving Projects.doc <br />