My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06/07/1999 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1999-2020 Park Board Packets
>
1999 Park Board Packets
>
06/07/1999 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2021 3:07:34 PM
Creation date
7/23/2021 11:50:23 AM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
06/07/1999
Park Bd Meeting Type
Regular
Park Bd Publication Type
Other
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
q4 <br /> Lino Lakes Parks and Recreation Department <br /> n 7204 Lake Drive <br /> O F M <br /> � <br /> Lino Lakes, N 55014 <br /> C I TY' �� (651) 780-1885 Fax (651) 784-7227 <br /> LlNon <br /> June 1, 1999 <br /> TO: Park Board Members <br /> FROM: Mike Hoffinan, Parks Supervisor <br /> SUBJECT: May Park Maintenance Update <br /> WANTED: Shepherd, Sheep Dog and flock of 15-20 sheep to perform mowing and <br /> trimming of city parks. <br /> Just kidding!!! <br /> No doubt some of you have noticed some of our parks look more like hay fields than park areas. <br /> I apologize, but,with the number of park improvement projects currently underway, as well as a <br /> lack of seasonal employees, we have been unable to keep up with the mowing. Once school lets <br /> out and our seasonals begin,we will get caught up with the mowing, trimming, and garbage <br /> pickup that we have been neglecting. <br /> Maintenance Highlight for May <br /> • Planting of shade trees at Sunrise, Birchwood Acres, Shenandoah, and Birch Parks. <br /> 40 bare root trees were planted at above mentioned parks primarily around new <br /> playground equipment and Sunrise Field#3. <br /> • Completion of improvements to Sunrise Little League Fields #3 and#4. <br /> • Site preparation and installation of Marshan Park Playground. Site was excavated to <br /> a 12"depth using our new Case 85XT with steel tracks. This machine performed <br /> beyond our expectations and is a valuable addition to our equipment fleet. <br /> Playground support posts were installed Friday,May 21 by maintenance staff and a <br /> certified playground installer. On Saturday, May 22 maintenance staff,neighborhood <br /> volunteers and installer hung decks and play events. Kid timbers have been installed <br /> and resilient surfacing should be installed the first week of June. Some items for this <br /> playground are on backorder and will be installed as they arrive. <br /> • Daily ballfied maintenance and preparation- We are currently game prepping 10-12 <br /> ballfields daily. This is a 6-8 hour process Monday—Thursday and is currently being <br /> done by full-time maintenance staff. Once our seasonals begin one or two of them <br /> will be trained in field preparation, allowing our full-time employees to work on other <br /> proj ects. <br /> • Soccer field preparation—Hanging nets, field layout, mowing and painting in-lines. <br />
The URL can be used to link to this page
Your browser does not support the video tag.