Laserfiche WebLink
Marshan Park- Park Development <br /> Preliminary Schematic Design Construction Cost Estimate <br /> March 1, 1999 <br /> Item Description Total Price <br /> 1 Removals 1,000.00 <br /> 2 Earthwork 20,000.00 <br /> 3 Utilities(includes water fountain and storm culverts if needed) 4,000.00 <br /> 4 Play Areas (includes equipment, container&sand): 32,800.00 <br /> 5 Paving: 30,500.00 <br /> Asphalt paths . . . . . . . . . . . . . . . . . . . . . . . . $ 21,500 <br /> Concrete walks . . . . . . . . . . . . . . . . . . . . . . . . $9,000 <br /> 6 Basketball '/z Court 7,000.00 <br /> 7 Site Amenities: (benches& picnic tables.) 9,000.00 <br /> 8 New Parking Area (includes asphalt& 66-12 curbing) .20,000.00 <br /> 8 Entrance Bollards(12) 2,200.00 <br /> 8 Backstop Fencing(12' high, 10'x 20'x 10') 2,500.00 <br /> 8 Ornamental fencing 19,600.00 <br /> 9 Gazebo structures 20,000.00 <br /> 10 Minimal pedestrian lighting 4,000.00 <br /> 11 Landscape Enhancements(trees and shrubs) 15,000.00 <br /> 12 Turf 14,000.00 <br /> Sod . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $5,000 <br /> Seed . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $9,000 <br /> 13 Construction surveying and staking 5,000.00 <br /> Construction Subtotal 206,600.00 <br /> C:\DOCS\1998\98-28\Marshan\prelim cost est.wpd <br />