My WebLink
|
Help
|
About
|
Sign Out
Home
Search
03/01/1999 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1999-2020 Park Board Packets
>
1999 Park Board Packets
>
03/01/1999 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2021 1:19:53 PM
Creation date
7/23/2021 1:07:03 PM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
03/01/1999
Park Bd Meeting Type
Regular
Park Bd Publication Type
Other
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Marshan Park- Park Development <br /> Preliminary Schematic Design Construction Cost Estimate <br /> March 1, 1999 <br /> Item Description Total Price <br /> 1 Removals 1,000.00 <br /> 2 Earthwork 20,000.00 <br /> 3 Utilities(includes water fountain and storm culverts if needed) 4,000.00 <br /> 4 Play Areas (includes equipment, container&sand): 32,800.00 <br /> 5 Paving: 30,500.00 <br /> Asphalt paths . . . . . . . . . . . . . . . . . . . . . . . . $ 21,500 <br /> Concrete walks . . . . . . . . . . . . . . . . . . . . . . . . $9,000 <br /> 6 Basketball '/z Court 7,000.00 <br /> 7 Site Amenities: (benches& picnic tables.) 9,000.00 <br /> 8 New Parking Area (includes asphalt& 66-12 curbing) .20,000.00 <br /> 8 Entrance Bollards(12) 2,200.00 <br /> 8 Backstop Fencing(12' high, 10'x 20'x 10') 2,500.00 <br /> 8 Ornamental fencing 19,600.00 <br /> 9 Gazebo structures 20,000.00 <br /> 10 Minimal pedestrian lighting 4,000.00 <br /> 11 Landscape Enhancements(trees and shrubs) 15,000.00 <br /> 12 Turf 14,000.00 <br /> Sod . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $5,000 <br /> Seed . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $9,000 <br /> 13 Construction surveying and staking 5,000.00 <br /> Construction Subtotal 206,600.00 <br /> C:\DOCS\1998\98-28\Marshan\prelim cost est.wpd <br />
The URL can be used to link to this page
Your browser does not support the video tag.