Laserfiche WebLink
b <br /> Behms Century Farm Park - Park Development <br /> .-•� Preliminary Schematic Design Construction Cost Estimate <br /> March 1, 1999 <br /> Item Description Total Price <br /> 1 Removals 1,000.00 <br /> 2 Earthwork 20,000.00 <br /> 3 Utilities (includes culverts,water fountain, etc.) 6,000.00 <br /> 4 Play Areas(includes equipment, container& sand): 34,000.00 <br /> 5 Paving: 39,100.00 <br /> Asphalt trails . . . . . . . . . . . . . . . . . . . . . . . . . $ 36,600 <br /> Concrete walks . . . . . . . . . . . . . . . . . . . . . . . . $2,500 <br /> 6 Basketball '/2 Court 7,000.00 <br /> 7 Site Amenities: (benches, etc.) 7,800.00 <br /> 8 Backstop Fencing 02' high, 10'x20'x101 2,500.00 <br /> 9 Gazebo structure 20,000.00 <br /> 9 Garden House Structure 20,000.00 <br /> 10 Minimal pedestrian lighting 4,000.00 <br /> 11 Landscape Enhancements(trees and shrubs) 15,000.00 <br /> 12 Turf 12,000.00 <br /> Sod . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 5,000 <br /> Seed . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $7,000 <br /> 13 Construction surveying and staking 5,000.00 <br /> Construction Subtotal 193,400.00 <br /> C:\DOCS\1998\98-28\Behms\prelim cost est.wpd <br />