Laserfiche WebLink
City of Lino Lakes <br /> Park Board Meeting <br /> January 4, 1999 <br /> $3 , 000 for site preparation. Designated funds for Marshan Park <br /> will include $27, 000 for playground equipment and $5, 000 for site <br /> preparation. The goals will include $4 , 500 to resurface the <br /> tennis courts at Arena Acres . A Wheels Program will include <br /> $10 , 000 , with more information to follow. Seal coating of trails <br /> and trail repair was set at $20, 000 . <br /> Chair Lindy suggested the goals should not be finalized until <br /> more information is received regarding the upcoming Master <br /> Planning meetings and the Wheels Program. He stated those issues <br /> will be clarified at the next meeting. <br /> Paul Montain made a motion, seconded by Pam Taschuk, to accept <br /> the 1999 Park Board goals as discussed. The motion passed. <br /> Park Dedication History 1993-1998 - Rick referred to a hand out <br /> that reviewed the Park Dedication Revenue for 1993 through 1998 . <br /> Arena Acres Residents Survey - Rick noted that a copy of the <br /> Arena Acres Residents Survey, a color coded map listing the type <br /> of response, and comments from the survey was distributed to each <br /> n Park Board member. <br /> Chair Lindy noted the survey clearly supports that play <br /> structures are needed at Arena Acres . <br /> Wenzel Farms Pedestrian Bridge - Rick referred to a handout that <br /> gives a cost estimate for two types of prefabricated pedestrian <br /> bridges for Wenzel Farms . He noted that $11, 000 has been <br /> earmarked for a Wenzel Farms pedestrian bridge . He indicated he <br /> will provide more information on other options at a later date. <br /> Pam suggested that because of the estimated cost, the Board <br /> should hold off until more information on other options is <br /> available. <br /> Sharon asked about the possibility of a boardwalk. Rick stated <br /> he will have to see if a boardwalk would be feasible in that <br /> location. It is conceivable that a boardwalk would be less <br /> expensive than a pedestrian bridge . <br /> Pam asked who is responsible for the storm damage cost . Rick <br /> stated that the damage occurred before the easement was acquired. <br /> n <br /> If a bridge is approved, the City will approach the Wenzel Farms <br /> Townhome Association to address the clean up. <br /> 3 <br />