My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08-04-2021 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
2021 Park Board Packets
>
08-04-2021 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2023 3:34:00 PM
Creation date
7/30/2021 1:33:30 PM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
08/04/2021
Park Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />DATE: August 4, 2021 <br /> <br />TO: Park Board Members <br /> <br />FROM: Rick DeGardner, Public Services Director <br /> <br />RE: Parks Updates <br /> <br /> <br />A. Tennis and Pickleball Courts Update - Erosion control measures are in place and general <br />earthwork and stormwater ponds development have started. The aggregate sub-base of the <br />courts has been placed with sampling/testing being conducted. <br /> <br />Sub-cutting of the parking and trail areas, along with storm sewer installation are scheduled for <br />the next week. Upper Midwest Athletic will begin pouring footings and installing the court <br />perimeter fence posts mid-August. Once the footings are complete, the concrete maintenance <br />strip and court bituminous will be installed. <br /> <br />Most significant delay revolves around the fence fabric. Aluminum coated steel that was specified <br />required approximately 12 weeks lead time. This puts delivery for early September. The contractor <br />suggested a substitution of zinc coated galvanized for the fencing, which is more readily available. <br />Long term we feel that the aluminized is a better product that will hold up better and last longer. <br />It is also smoother to the touch, as galvanized can have some sharp edges when the dipping takes <br />place. We chose to stay with the aluminum coated steel as specified. <br /> <br />The revised substantial completion date is September 30, 2021. <br /> <br />B. Lino Park - The large playground structure, swings, independent play events, concrete edging, <br />bike rack pad, and engineered wood fiber have been installed. We are still waiting on delivery of <br />the 2-5 age play structure. Public Services Department staff installed a wall mounted bottle filling <br />station on the irrigation shed. <br /> <br />The ornamental fencing material has been ordered with an expected delivery of mid-August. <br />Additional concrete work is scheduled the week of September 1. Benches and tables have been <br />ordered and are expected to be delivered mid-October. <br /> <br />C. Clearwater Creek Park Playground Replacement - Still plan on removing and replacing the <br />playground equipment at Clearwater Creek Park this Fall. <br />
The URL can be used to link to this page
Your browser does not support the video tag.