Laserfiche WebLink
- Design Concept Cost Estimate Birch Park <br /> Design Concept Cost Estimate <br /> for Birch Park <br /> Item Includes Materials and <br /> Installation <br /> Site Vbbrk Gear and grub 50Q 00 <br /> underbrush. <br /> General grading to level site for proposed 2,000.00 <br /> uses. <br /> Trail Development 6'and 8'asphalt trail through park 15,000.00 <br /> Play Structure 6"x 6"timber container(2 high x 550 LF) 5,500.00 <br /> 12"sand base 2,800.00 <br /> (240 Cl) <br /> Play and swing structure 25,000.00 <br /> Gazebo Overlook Budget figure for covered structure 12,000.00 <br /> Site Amenifies Picnic tables 3,000.00 <br /> ^ Development <br /> Site benches z 400.00 <br /> Horseshoe pit 600.00 <br /> Half-court basketball 5,500.00 <br /> Exercise course 2,500.00 <br /> Seed/Sod and Plantings(trees and ground cover). 10,000.00 <br /> Plantings <br /> Sod high traffic areas 1,500.00 <br /> Seed manicured turf areas. 5,500.00 <br /> Total 93,800.00 <br /> Cost Note: The above materials and installation costs are based on spring 1995 prices as supplied by <br /> local contractors. Costs are also based on the assumption that negotiated contracts will be used for the <br /> various work items(as opposed to a formal bid process). <br /> City of Lino Lakes 1 Brauer&Associates, Ltd. #95-11 <br />