My WebLink
|
Help
|
About
|
Sign Out
Home
Search
02/22/1995 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1995 Park Board Packets
>
02/22/1995 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2021 12:53:02 PM
Creation date
8/6/2021 10:15:12 AM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
02/22/1995
Park Bd Meeting Type
Joint
Park Bd Publication Type
Other
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGENDA ITEM <br /> STAFF ORIGINATOR: Marty Asleson <br /> DATE: March 27,1995 <br /> TOPIC: Behm's Century Farm Park Dedication Consideration <br /> BACKGROUND <br /> Behm's Century Farms is a multi-phased, multi-additioned, <br /> development with phase one consisting of 52.4 acres, 105 lots, with <br /> a 2.0 units/acre current application, and an unestablished market <br /> value of $8000 per acre. The approximate upland area is estimated <br /> at 42.2 acres and the wetland at 10.2 acres. This development is <br /> on the north and west side of the city. This development is <br /> bounded by Sunset road on the west, and extending in an irregular <br /> path to the south and east between the State Correctional Facility <br /> on the south and the Lino Air Park on the north. Existing <br /> neighborhood park N -7 lies adjacent to this development on the <br /> northwest corner. The development is to be proposed in phases, <br /> with phase one indicated on the enclosed maps. <br /> Since this area has an existing 8.62 acre park in this area, no <br /> land dedication should be needed. The challenge with this <br /> neighborhood is to provide an effective trail link access to the <br /> park for residents. Please refer to the enclosed maps. A <br /> transportation trail (13) connecting into Laurie Ave. and into the <br /> park should accomplish this on the south. Another option would be <br /> to connect the cul-de-sac at the end of Thomas Street to the cul- <br /> de-sac on the north side of Phase 1. <br /> This area according to Jeff Schoenbauer was probably the most <br /> difficult to achieve the linear trail corridor concept. As you can <br /> see, about the only passable location for this corridor was through <br /> the air park traversing at a northeast angle. It is thought that <br /> at this time the best opportunity to achieve a linear park trail in <br /> this area of the city would be the loop segment 5,6,7,and 8, and to <br /> connect into this via transportation trails along 4th ave. <br /> Please find enclosed the developers proposal with statistical <br /> breakout. <br /> h <br />
The URL can be used to link to this page
Your browser does not support the video tag.