Laserfiche WebLink
DirectorsAthletic <br /> • • Coaches <br /> i <br /> 1 <br /> 9 <br /> L <br /> — right the wrong after it's been done,aside and people are swimming around, bang- <br /> from putting up a sign that says, 'Under ing into these mushrooms. <br /> New Management.'" The trouble is,anticipating change is <br /> o — ® What's the problem?Read these,and no simple task.Older basketball courts, <br /> r weep: notes Bill Canning, assistant vice presi- <br /> o • Lack of oversight. Sad but true — dent of recreation at Tulane University, <br /> poor oversight is the cause of many may appear to have electrical outlets in <br /> CarronKnow problems, particularly some of those the wrong areas of the floor, but these <br /> smaller, irksome ones. A possible sce were designed when the game was <br /> • _ nario is one in which the architectural slower and the athletes smaller—when <br /> There's A Carri drawing shows a floor drain, but the scorer's tables sat closer to the game <br /> Dealer N- • plumber neglects to put the line in — than they do now, in other words. <br /> and the contractor,for whatever reason, Indeed,Canning says he's never painted <br /> Carron Netcan '- all doesn't think of it either. "None would permanent three-point arcs on Tulane's <br /> your •• net --• like to admit it, but it happens on every basketball courts since he's been <br /> We • - the most complete project," says David Body, a principal expecting the distance to change. <br /> line of • • • custom with Cannon-Parkin in Los Angeles.Adds Putting down the lines with tape every <br /> they're described Al Oberlander, an architect with RDG year saves the eventual expense of <br /> •ur catalog and-they <br /> Bussard Dikis in Des Moines, Iowa, "In resanding the entire floor when the trey <br /> FREE_ available ur my mind those are never a client's fault." line changes, but Canning says he's <br /> • •ll • • •Poor up-front planning.Wiggins calls beginning to wonder whether he might <br /> _ <br /> • of qualified • • this "the greatest flaw I've ever seen," be too far-sighted after all. <br /> authorized dealer akin to building without a blueprint. Anticipating change is a lot easier <br /> representatives, "Any architect or consultant worth when the planning team includes a man- <br /> their salt will spend a considerable ager or programmer who's lived with <br /> For the name of the dealer amount of time with the owner defining various mistakes in other venues. How- <br /> -' ll ll Free the very finite details of the program," ever, the entire team is responsible for <br /> Nationwide '' Wiggins says. "In an aquatic facility, for visualizing the way the building is most <br /> example,you have to define what sort of likely to be used. <br /> programs you want in that pool before "Needs can change over time," Can- <br /> you begin to think about the size,shape, ning says. "A gymnasium built just for <br /> depth, and whether you'll add slides or basketball doesn't need to have the <br /> sprinklers or any of the other things that greatest acoustics in the world. But <br /> CARRON NET COMPANY, are becoming popular these days. Some after it's built,and somebody sees what <br /> • BOX 177 9 Two Rivers,WI 54241 of those leisure-pool components, once a wonderful space it is and decides to <br /> you get them in there you can't get them hold high school graduations there,and <br /> L QUALITY NETS SINCE 1934 out again—so what are you going to do all of a sudden you can't hear the <br /> if your program changes to lap swimming speaker — that's not the fault of the <br /> i 30 ATHLETIC BUSINESS August 1995 <br />