Laserfiche WebLink
4D. <br /> AGENDA ITEM <br /> STAFF ORIGINATOR: Marty Asleson <br /> DATE: October 26, 1995 <br /> TOPIC: Leonard and Bradley Trail Wetland Delineation <br /> BACKGROUND <br /> Established as a past goal, that transpired from the restoration <br /> of Sunset Oaks Park, the delineation of the wetland West of <br /> Jeanne Drive and located on eastern portion of outlot F was <br /> completed. Please find the summary information concerning this <br /> delineation. <br /> After receiving the wetland delineation, Dave Ahrens, our new <br /> City Engineer looked at this hypothetical trail for the <br /> possibility of meeting the maximum allowed fill of 400 square <br /> feet without mitigation needs. <br /> The trail would need to be placed 3 feet off of the property line <br /> in at least two spots to accomplish this. Furthermore, the <br /> resident at lot 9 has called to show concern about drainage and <br /> security concerns. <br /> Dave Ahrens and I will look at the drainage concern, and should <br /> have some information at the meeting. <br /> I believe that the intent here originally, was to initially <br /> simply investigate the wetland area in this outlot, before <br /> opening up the trailway through the trees on the park side. <br /> Concern was voiced over traffic traveling through the yard at lot <br /> 9. <br /> Should the Park Board want to consider this trail project <br /> further, I would suggest more discussions with the residents <br /> adjacent to the trail. <br /> OPTIONS <br /> This is informational and finishes a goal set forth by the Park <br /> and Recreation Board. <br />