My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10/02/1995 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1995 Park Board Packets
>
10/02/1995 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2021 3:40:44 PM
Creation date
8/13/2021 9:34:26 AM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
10/02/1995
Park Bd Meeting Type
Regular
Park Bd Publication Type
Other
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF LINO LAKES <br /> PARK BOARD MEETING <br /> Aloft% SEPTEMBER 11, 1995 <br /> Marty also reported that the neighborhood may be doing some <br /> fundraising to purchase trees . <br /> Ken asked if there would be any playground equipment <br /> installed this year. Marty and George both felt that this <br /> was not a top priority, with the neighborhood, and they have <br /> put it on the back burner for now. <br /> Marty explained that he had estimated the trail rock price <br /> to be about $8 . 00/ton and he is paying $7 .26/ton. He said <br /> the property owners are becoming involved in the work, they <br /> helped put the trail location in between the trees . <br /> Wenzel Farms - This park is about 90 per cent complete. It <br /> is turning into a pretty little park. The neighborhood <br /> group installed the hard surface court area one weekend and <br /> the playground equipment the next . New recycling bins will <br /> be placed in the park. The picnic tables donated from <br /> Moline Concrete have also been placed in the park. <br /> The seeding will be done the week of September loth, the <br /> paint has been ordered for the basketball court, and the <br /> volleyball court will be put in next spring. <br /> The playground company will be giving (at no charge) the <br /> neighborhood a Four Seater-Teeter because some of the posts, <br /> that were delivered, were the wrong color. <br /> Marty said that Michael Krech, Lino Lakes Engineering <br /> Technician, did a very good job with the grade layout for <br /> this park. <br /> Country Lakes - The parking lot will be moved as Phase One <br /> of this park. The engineers have been on Birch Street to <br /> get hubs to tie into the elevation. He said the hubs are <br /> important for future work in the park. The contractor will <br /> be moving the rock and excess dirt this week. He reported <br /> that there is a visibility problem at West Shadow Lake Drive <br /> so maybe the contractor can brush that area when he is in to <br /> do other areas in the park. <br /> City Hall - The hockey rink has been rough graded by city <br /> staff . The building site is laid out and the building will <br /> be moved after October 1 . The utilities will be stubbed in <br /> prior to moving the building. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.