My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2021-087 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2021
>
2021-087 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2021 12:38:57 PM
Creation date
8/24/2021 12:38:57 PM
Metadata
Fields
Template:
City Council
Council Document Type
Resolutions
Meeting Date
08/23/2021
Council Meeting Type
Regular
Resolution #
21-87
Resolution Title
Resolution Order Project, Approve Plans and Specifications, and Authorize Advertisement for Bids for the CRJ/CSAH 49 (Hodgson Road) Trunk Utility Improvements
Resolution Date Passed
08/23/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4111 CITY COUNCIL <br /> AGENDA ITEM 6B <br /> STAFF ORIGINATOR: Diane Hankee, PE City Engineer <br /> C. C. MEETING DATE: August 23, 2021 <br /> TOPIC: Consider Resolution 21-87, Order Project, Approve the Plans <br /> and Specifications and Authorize the Ad for Bid, CRJ/CSAH <br /> 49 (Hodgson Road) Trunk Utility Improvements <br /> VOTE REQUIRED: 3/5 <br /> INTRODUCTION <br /> Staff is requesting Council approval to authorize the ad for bid for the CRJ/CSAH 49 (Hodgson <br /> Road) Trunk Utility Improvements. <br /> BACKGROUND <br /> On March 26,2018,the City Council approved the preparation of the plans and specifications for <br /> the CRJ/CSAH 49 (Hodgson Road)Trunk Utility Improvements. <br /> • The improvements include construction of a sanitary sewer lift station and watermain <br /> proposed <br /> looping in the southwest corner of the City. The City's water system is in need of strengthening in <br /> that part of the City which is mitigated by the water system looping. The lift station is sized to serve <br /> approximately 50 acres both east and west of Hodgson Road. Watermain and a sanitary forcemain <br /> would be extended from Woodridge Lane to the western edge of the Lyngblomsten project. The <br /> Lyngblomsten project will extend these facilities to the north and east. <br /> The project cost including contingencies and overhead is $1.2 million. The project is funded <br /> through the trunk area and unit fund. Due to material delays and contractor labor shortages, <br /> construction costs are reported to be higher and the project cost estimates have been adjusted. <br /> Lift station materials can take up to a year to become available thus awarding a contract this fall <br /> will help address the delays. <br /> The estimated schedule for the project: <br /> Order Improvement,Authorize Plans and Specifications March 26,2018 <br /> Approve Plans and Specifications,Authorize Ad for Bids August 23,2021 <br /> City Opens Bids September 22,2021 <br /> City Council Awards Contract September 27,2021 <br /> Construction Begins Fall,2021 <br /> Final Completion September,2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.