Laserfiche WebLink
2. Undesirable tree species do not have to be mitigated for. Removals of a 22" and <br /> 8" ash will not require mitigation trees to be planted. The total number of <br /> replacement trees required is 24. This should be updated on the Tree Preservation <br /> Plan. <br /> 3. Canopy cover standards have not been met. The three trees on the western edge <br /> of the stormwater basin can be moved closer to the hardscape, or the parking <br /> stalls can be added, which would require recalculation of the hardscape and <br /> canopy cover totals. <br /> 4. 34 more shrubs will be required to meet open space standards. <br /> 5. White pine (Pinus strobus) should be switched for a species with better pollution <br /> tolerance. <br /> 6. Native seed mix should be used for the southeast corner of the site in the low <br /> runoff area connecting to the culvert. <br /> ATTACHMENTS <br /> 1. Belland Farms Preliminary Plat Title Sheet <br /> 2. Belland Farms Prelimary Plat (3/11) <br /> 3. Existing Drainage Conditions (pg. 10/80 of Stormwater Management Plan) <br /> 4. Proposed Drainage Conditions (pg. 11/80 of Stormwater Management Plan) <br /> 5. Storm Water Pollution Prevention Plan <br /> 6. Wetlands-Existing Conditions (pg. 14/51 of the Wetland Permit Application) <br /> 7. AECP Landscape Plan Sheets 1, 2, and 3 <br /> 8 <br />