Laserfiche WebLink
5 <br /> <br />5. Trail Easement: <br />a. The City shall draft a trail easement document. <br />b. The applicant shall draft a trail easement exhibit clearly showing a 44 ft wide <br />easement along the south lot line of 6351 20th Avenue and 20 ft wide easement <br />along CSAH 54/20th Avenue for City review and approval. <br />6. Wetland Buffer Declaration: <br />a. The City shall draft a wetland buffer declaration. <br />b. The applicant shall draft Attachment A-Wetland Buffer exhibit. <br />i. Wetland buffer widths shall be consistent with VLAWMO requirements <br />and the 75 ft wide buffer along Wetland A. <br />ii. The attachment shall show the location of the free-standing markers and <br />include the City’s wetland buffer sign detail. <br />c. The applicant shall have a wetland specialist draft Attachment B-Wetland Buffer <br />Vegetation Management Plan. <br />7. The applicant shall provide documentation that the UPA Easement is in the process of <br />being vacated. <br />8. Sheet S1, Preliminary Plat: <br />a. The 59ft wide drainage and utility easement shown along the north lot line shall <br />only be as wide as needed. <br />i. The trail easement and drainage & utility easement are not the same type <br />of easement. <br />b. The drainage and utility easement on Lot 4 north of the wetland shall clearly tie <br />into the easement along CSAH 54. <br />c. The drainage and utility easement on the south end of Lot 4 shall be a minimum <br />of 20 ft wide along CSAH 54. <br />d. It shall be noted on the preliminary plat and future certificate of surveys, “The lots <br />will have limited ability to construct accessory structures, decks and additions due <br />to OHWL setbacks, floodplain, wetland buffers and topography.”. <br />e. Structures, stormwater facilities and private septic systems shall not be located <br />within the 150 ft OHWL setback, 40 ft CSAH 54 setback or 10 ft side yard <br />building setbacks. <br />i. On Lot 1, the stormwater facility is in 40ft setback and trail corridor. This <br />shall be revised. <br />9. Sheet S4, Ghost Plat: <br />a. The ghost plat shall be revised to reflect a street right-of-way extending to the <br />north parcel PID #35-31-22-12-0001. <br />i. The house on Lot 1 shall meet 30 ft setback from ghost plat street right-of- <br />way. <br />ii. Include revision dates <br />10. Sheet TR1-TR2, Tree Preservation and Tree Mitigation Plan: <br />a. The stormwater/raingarden basins are not part of the basic use area. All plans and <br />mitigation calculations shall be revised accordingly. <br />11. Sheets C01-C05, Site Grading: <br />a. Structures, stormwater facilities and private septic systems shall not be located <br />within the 150 ft OHWL setback, 40 ft CSAH 54 setback or 10 ft side yard <br />building setbacks. The plans shall be revised. <br />i. On Lot 1, the stormwater facility is in 40ft setback and trail easement. <br />This shall be revised.