Laserfiche WebLink
Watermark 4th Addition <br />Development Agreement <br />April 12, 2021 <br /> page 4 <br />g. Water mains, laterals or extensions, including all necessary building services, <br />hydrants, valves and other appurtenances, shall be furnished and installed. <br />h. The Developer shall place iron monuments at all lot, block, and outlot corners <br />and at all other angle points on boundary lines consistent with the final plat. <br />Iron monuments shall be placed after all street and lawn grading has been <br />completed in order to preserve the lot markers for future property owners. Lot <br />corner irons on the back property line shall be installed so that the top of the <br />iron corresponds to the finished ground elevation in accordance with the <br />approved grading plan. Guard stakes shall be appropriately installed to mark <br />these irons. <br />i. Landscaping shall be furnished and installed in accordance with the approved <br />plans. Boulevard Tree Planting shall be the responsibility of the Developer. <br />Developer shall confirm tree selection with City prior to ordering. City retains <br />the right to make changes to species prior to ordering. <br />Developer shall be responsible for vegetative restoration of ponding areas, <br />outlots, wetland mitigation areas, and other native planting areas identified on <br />the plans in accordance with City Standard Specifications for Construction. <br />Developer shall contract with a qualified firm for the establishment and <br />maintenance of all native plant areas. Said contract shall cover a minimum of the <br />3 year establishment period, from the date of planting. <br />j. The Developer shall arrange for all gas, telecommunications, cable, internet, <br />electric, and other necessary private utility services to the Subdivision in <br />accordance with City Code and State law. The utilities are required to be located <br />within a joint trench. Street light installations shall be initiated by the Developer <br />with City Engineer approval. The Developer is solely responsible for the cost of <br />private utility installation. <br />k. The Developer shall install mailboxes in accordance with Federal and Postal <br />Service regulations. <br />l. The Developer shall install conservation easement signs per City standard detail <br />plates prior to the issuance of building permits. <br />7. Time of Performance. The Developer shall install all required improvements <br />enumerated in Paragraph 6 by November 30, 2022. The Developer may request a <br />reasonable extension of time from the City. If the extension is granted, it shall be <br />conditioned upon updating the security posted by the Developer to reflect cost <br />increases and the extended completion date. <br />8. Record Drawings.